Laserfiche WebLink
APPENDIX B <br /> REPORT LIMITATIONS AND GUIDELINES FOR USE: <br /> This appendix provides information to help you manage your risks with respect to the use of this report. <br /> Geotechnical Services Are Performed for Specific Purposes, Persons and Projects <br /> This report has been prepared for the exclusive use of Cadman Materials, Inc.and their authorized agents <br /> for the Delta Site Soil Remediation Facility.This report is not intended for use by others,and the information <br /> contained herein is not applicable to other sites. <br /> GeoEngineers structures our services to meet the specific needs of our clients.For example,a geotechnical <br /> or geologic study conducted for a civil engineer or architect may not fulfill the needs of a construction <br /> contractor or even another civil engineer or architect that are involved in the same project. Because each <br /> geotechnical or geologic study is unique, each geotechnical engineering or geologic report is unique, <br /> prepared solely for the specific client and project site. Our report is prepared for the exclusive use of our <br /> Client. No other party may rely on the product of our services unless we agree in advance to such reliance <br /> in writing.This is to provide our firm with reasonable protection against open-ended liability claims by third <br /> parties with whom there would otherwise be no contractual limits to their actions.Within the limitations of <br /> scope,schedule and budget,our services have been executed in accordance with our Agreement with the <br /> Client and generally accepted geotechnical practices in this area at the time this report was prepared.This <br /> report should not be applied for any purpose or project except the one originally contemplated. <br /> A Geotechnical Engineering or Geologic Report Is Based on a Unique Set of Project-specific <br /> Factors <br /> This report has been prepared for the proposed Delta Site Soil Remediation Facility located at 17 East <br /> Marine View Drive in Everett, Washington. GeoEngineers considered a number of unique, project-specific <br /> factors when establishing the scope of services for this project and report.Unless GeoEngineers specifically <br /> indicates otherwise,do not rely on this report if it was: <br /> ■ not prepared for you, <br /> ■ not prepared for your project, <br /> ■ not prepared for the specific site explored,or <br /> ■ completed before important project changes were made. <br /> For example,changes that can affect the applicability of this report include those that affect: <br /> ■ the function of the proposed structure; <br /> ■ elevation,configuration, location,orientation or weight of the proposed structure; <br /> ■ composition of the design team;or <br /> ■ project ownership. <br /> GEOENGINEERS August3,2018 Page B-3 <br /> File No.0643-015 00 <br />