Laserfiche WebLink
FOUNDATIONS GENERAL <br /> 1. ALL MATERIALS NO WORKMANSHIP SHALL CONFORM TO THE CONTRACT SILL PLATE AND ANCHOR BOLTS <br /> 1. THE FOUNDATION DESIGN IS BASED ON THE RECOMMENDATION IN THE INTERNATIONAL DRAWINGS. . PER SHEARWALL SCHEDULE. MIN <br /> BUILDING CODE TABLE 1804.2. FOUNDATION WORK SHALL BE PERFORMED IN ACCORDANCE 6" MIN � ANCHOR BOLTS ® 48" 0 <br /> WITH CHAPTER 18 OF THIS CODE. 2. DURING THE CONSTRUCTION PERIOD THE CONTRACTOR SHALL BE /C 01 N S$ <br /> RESPONSIBLE FOR E SAFETY OF THE BUILDING. THE CONTRACTOR SHALL <br /> 2. THE FOUNDATION DESIGN IS BASED ON THE FOLLOWING VALUES: PROVIDE ADEQUATE SHORING, BRACING AND GUYS IN ACCORDANCE WITH <br /> ALLOW. SOIL BEARING 1500 PSF ALL NATIONAL, STATE AND LOCAL SAFETY ORDINANCES. ANY DEVIATION <br /> SOIL FRICTION .25 MUST BE APPROVE PRIOR TO ERECTION. —III—III—III-I 2)H—BARS AT TOP <br /> EQUIV. FLUID PRESSURE <br /> ACTIVE PRESSURE* 35 PCF 3. ALL ERECTION PROCEDURES SHALL CONFORM'TO OSHA STANDARDS. 11—III—III= III 'A: <br /> PASSIVE PRESSURE 150 PCF ANY DEVIATION MUST BE APPROVED BY OSHA PRIOR TO ERECTION. III=I 4' W <br /> (*WALLS RESTRAINED AGAINST ROTATION SHALL BE DESIGNED FOR AN EQUIV. <br /> FLUID PRESSURE OF 55 PCF). 4. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL U N <br /> CONSTRUCTION PR CEDURES INCLUDING LAGGING, SHORING AND PROTECTION Q N <br /> 3. ALL FOOTINGS SHALL BE FOUNDED AT LEAST 18" BELOW THE UNDISTURBED GROUND OF ADJACENT PROPERTY, STRUCTURES, STREETS AND UTILITIES IN 2" CL ;' l(� �t tj <br /> SURFACE OR TO FROST DEPTH. A L FOOTINGS SHALL BE FOUNDED ON COMPACTED FILL ACCORDANCE WITH ALL NATIONAL, STATE AND LOCAL SAFETY ORDINANCES. N <br /> OR UNDISTURBED NATURAL GRAD V-BARS RETAINING WALL NOTES w E <br /> UNLESS OTHERWISE NOTED. 5. THE CONTRACTORSHALL BE RESPONSIBLE FOR COORDINATING THE WORK Q >C? <br /> 015 INTERNATIONAL BUILDING CODE Q— <br /> 4. COMPACTION: MATERIAL FOR ILLING AND BACKFILLING SHALL CONSIST OF THE OF ALL TRADES AN SHALL CHECK ALL DIMENSIONS. ALL DISCREPANCIES 35 PCF EQUIV. LUID PRESSURE p t <br /> EXCAVATED MATERIAL AND/OR IM ORTED BORROW AND SHALL BE FREE OF ORGANIC SHALL BE CALLED 0 THE ATTENTION OF THE ENGINEER AND BE RESOLVED •e w N L <br /> BEFORE PROCEEDIN WITH THE WORK. 40 SF SURCHARGE �O <br /> MATTER, TRASH, LUMBER, OR OTHER DEBRIS. ALL WALLS SHALL BE ADEQUATELY BRACED � U � <br /> PRIOR TO BACKFILLING. FILL AND BACKFILL SHALL BE DEPOSITED IN LAYERS NOT TO f'c = 2500 PSI Q <br /> EXCEED 8 INCHES THICK, PROPER Y MOISTENED TO APPROXIMATE OPTIMUM REQUIREMENTS 6. DRAWINGS INDIC TE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION. H—BARS Fy = 40 KSI (# AND SMALLER) <br /> AND THOROUGHLY ROLLED OR CO PACTED WITH APPROVED EQUIPMENT IN SUCH A WHERE CONDITIONS ARE NOT SPECIFICALLY INDICATED BUT ARE OF SIMILAR •�< Fy = 60 KSI ( 5 AND LARGER) N 3 <br /> MANNER AND EXTENT AS TO PRODUCE A RELATIVE COMPACTION OF 90% OF MAXIMUM CHARACTER TO DETAILS SHOWN, SIMILAR DETAILS OF CONSTRUCTION SHALL "4• SOIL BEARING = 1500 PSF <br /> POSSIBLE DENSITY AS DETERMINEO BY ASTM D1557. HAND TAMPERS SHALL WEIGH AT BE USED SUBJECT TO REVIEW BY THE ENGINEER. BACKFILL W/ P ROUS MATERIAL m m <br /> LEAST 50 POUNDS EACH AND SH LL HAVE A FACE AREA NOT IN EXCESS OF 64 SQUARE n? <br /> INCHES. HAND TAMPERS MAY BE OPERATED EITHER MANUALLY OR MECHANICALLY AND 7. ALL DETAILS DESIGNATED AS STANDARD OR TYPICAL SHALL OCCUR IN w N <br /> SHALL BE USED WHERE LARGER ADDITION TO ANY OTHER SPECIFIC DETAIL CALLED OUT. N OWER DRIVEN COMPACTION EQUIPMENT CANNOT BE USED. � � <br /> FILL OVER 12" DEEP SHALL COMP Y WITH A GEOTECHNICAL REPORT. SEE GEOTECHNICAL REPORT FOR FURTHER DESIGN C g, COORDINATE WITH MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS '° V tu <br /> z <br /> R TERIA. FOR.SIZE AND LOCATION OF ALL OPENINGS REQUIRED FOR DUCTS, PIPES, MATCHING DOWEL <br /> CONCRETE PIPE SLEEVES, ELECTRICAL CONDUITS, AND OTHER ITEMS TO BE EMBEDDED EACH VERT.' LAP <br /> O <br /> IN CONCRETE OR 0 42 BAR DIAMETERS OTHERWISE INCORPORATED IN STRUCTURAL WORK. ° <br /> 1. ALL CONCRETE UNLESS OTHERWISE NOTED SHALL BE REGULAR WEIGHT HARD ROCK MIN ` • V—BARS v J <br /> TYPE (150 PCF) AGGREGATES SHALL CONFORM TO ASTM C33 WITH PROVEN SHRINKAGE 9• PROVIDE OPENIN S AND SUPPORTS, AS REQUIRED PER STANDARD 4" 0 PERF. PLASTIC PIPE ;.. <br /> CHARACTERISTICS OF LESS THAN 0.05%. DETAILS FOR HEATERS, MECHANICAL EQUIPMENT, VENTS, DUCTS, PIPING, CENTERED IN 1 CUBIC ; Z <br /> ETC. ALL SUSPENDED MECHANICAL EQUIPMENT SHALL BE SWAY OR FOOT WASHED PEA O <br /> 2. CONCRETE COMPRESSIVE STRENGTHS AT 28 DAYS (f'c) SHALL BE: LATERALLY BRACED GRAVEL AND DRAINED TO u� <br /> CONTINUOUS FOOTINGS: 2500 PSI DAYLIGHT OR APPROVED <br /> 10. ALL INFORMATI N SHOWN ON THE DRAWINGS RELATIVE TO EXISTING OUTFALL AB ON GRADE <br /> * ALL CONCRETE EXPOSED T WEATHER MUST HAVE AN f c >= 3000 PSI. CONDITIONS IS GIVEq AS THE BEST PRESENT KNOWLEDGE BUT WITHOUT <br /> 3. ALL CONCRETE WITH A DESIGNATED COMPRESSIVE STRENGTH EXCEEDING 2500 PSI GUARANTEE OF AC URACY. WHERE ACTUAL CONDITIONS CONFLICT WITH m <br /> THE DRAWINGS, THEY SHALL BE REPORTED TO THE ENGINEER SO THAT THE <br /> SHALL REQUIRE SPECIAL INSPECTION BY AN INSPECTOR APPROVED BY THE BUILDING o• o•O <br /> PROPER REVISIONS MAY BE MADE. MODIFICATION TO DETAILS OF T—BARS p o o' ' w <br /> DEPARTMENT AND THE ENGINEER. EXCEPTION: WHERE 3000 PSI CONCRETE IS USED FOR CONSTRUCTION SH LL NOT BE MADE WITHOUT PRIOR WRITTEN APPROVAL Q0.§0 p <br /> WEATHERING PURPOSES, NO INPS CTION IS REQUIRED. OF THE ENGINEER. 2" CL O;$�0,•°Oo <br /> 4. CEMENT SHALL CONFORM TO ASTM C150, TYPE I, CSA NORMAL. < p <br /> 11. ARCHITECTURAL AND MECHANICAL PLANS ARE CONSIDERED A PART OF .° .. — _ Z <br /> 6. PLACEMENT OF CONCRETE SHA L BE IN CONFORMANCE WITH ACI 301. THE STRUCTURAL DESIGN DRAWINGS AND ARE TO BE USED TO DEFINE ` .e.• " , ° .., •.. ? .., III-1 DETAIL I— <br /> CONFIGURATIONS INCLUDING; BUT NOT LIMITED TO RELATIVE ; a• _ <br /> LOCATION OF MEMBERS, ELEVATIONS, DIMENSIONS AND LOCATIONS OF ALL j~ I-I <br /> 7. CONCRETE SHALL BE MAINTAIN D IN A MOIST CONDITION FOR A MINIMUM OF FIVE (5) OPENINGS, ETC. 1 j El <br /> DAYS AFTER PLACEMENT. ALTERNATE METHODS WILL BE APPROVED IF SATISFACTORY <br /> PERFORMANCE CAN BE ASSURED. <br /> 8. KEYED CONSTRUCTION JOINTS HALL BE USED IN ALL CASES. ALL CONSTRUCTION �3- CL Q <br /> JOINTS SHALL BE THOROUGHLY CLEANED AND ALL LAITANCE SHALL BE REMOVED. ALL <br /> VERTICAL JOINTS SHALL BE THOROUGHLY WETTED AND SLUSHED WITH A COAT OF NEAT CEMENT IMMEDIATELY BEFORE PLACING NEW CONCRETE. Z Qn <br /> 10. MINIMUM CONCRETE COVERAGEOF REINFORCING STEEL FOR FORMED WORK SHALL BE A B C Q m Q <br /> AS FOLLOWS: S <br /> EXPOSED TO EARTH OR WEATHER (#5 OR SMALLER): 1�1h" 2 O <br /> *NOTE: CONCRETE CAST AGAINST GROUND SHALL HAVE 3" MINIMUM COVERAGE Lu J <br /> I CANTILEVER RETAINING WALL SCHEDULE: 4 PSF SURCHARGE o N <br /> 12. CONCRETE MIXES SHALL BE PROVIDED IN ACCORDANCE WITH ACI 318 (WHEN STRENGTH I NO ES: 1. BACKFILL PRIOR TO MAKING ANY PERMANENT FLOOR CONNECTIONS N Lu <br /> DATA FROM TRIAL BATCHES OR F ELD EXPERIENCE ARE NOT AVAILABLE). 2. BOTTOM SLAB MUST BE IN PLACE PRIOR TO BACKFILLING ILJ <br /> CEMENT CONTENT SACKS PER D <br /> LB /CUBIC YARD CUBIC YARD H A B C D V—BARS H—BARS T—B RS F'c (PSI) (MINIMUM) (MINIMUM) NOV 04 2019 <br /> 2500(no special inspection) 470 5 CITYOF� <br /> SEE NOTE A 0'-4' 4" 8" 12" loll #4012"o/c #4012"o/c #4 "a/c CITY OF O SP ERFTERFT7 <br /> 3000 517 5h <br /> AIR ENTRAINMENT IS REQUIRED F R ALL CONCRETE EXPOSED TO WEATHER. FOR -y4" 4'— ' 4" 8" 27" loll #4012"o/c #4012"o/c #4 "o/c <br /> rov <br /> cov <br /> AGGREGATE AN ENTRAINMENT OF % IS REQ'D. FOR V AGGREGATE AN AIR ENTRAINMENT 6'—E' 8" 8" 36" loll #5010"o/c #4012"o/c #4 "o/c 9 Of 0 <br /> U � aF r�Z <br /> OF 7% IS REQ'D. y <br /> 9' 8" 8" 44" 10" #508"o/c #4®12"o/c <br /> MIXES SHALL BE PROPORTIONED 0 PRODUCE A SLUMP OF 5" OR LESS. NO MORE THAN <br /> A 1" PLUS TOLERANCE SHALL BE ALLOWED. •3 <br /> A) WHERE SPECIAL INSPECTION IS NOT REQUIRED UNDER SECTION 1704.4 OF THE I.B.C., <br /> CONCRETE SHALL HAVE A MINIMU14 CEMENT CONTENT OF 5 SACKS PER CUBIC YARD OF <br /> CONCRETE. W6v Q 12019 <br /> B) DESIGN MIX (OTHER THAN AS SPECIFIED IN THIS TABLE) SHALL BE SUBMITTED TO THE <br /> BUILDING OFFICIAL TWO WEEKS PRIOR TO FIRST USE. Drawn By: VKY <br /> Checked By: CCC <br /> Date: 1 1-01-19 <br /> SDA JOB NO. <br /> 8G74 B <br /> CITY OF EVERETT <br /> STRUCTURAL <br /> REVIEWED FOR PERMIT DETAILS <br /> 5-4 .0 <br />