Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 12/6/2021 12/6/2021 PERMIT EXTENSION TAWNYA EXTENSION due to structural issues <br /> HERMAN APPROVED <br /> Notes: <br /> From:Michael DePhillips<dephillipsmichael@gmail.com> <br /> Sent: Monday,December 6,2021 12:29 PM <br /> To:Tawnya Herman<THerman@everettwa.gov> <br /> Subject:[EXTERNAL] Permit Extensions <br /> CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the <br /> content is safe. <br /> Hi Tawnya, <br /> May I get a 6 month extension for these permits please? <br /> P2007-001 <br /> E2007-003 <br /> Best, <br /> Mike DePhillips <br /> Software Engineer <br /> Linkedln <br /> 5/16/2022 5/16/2022 ELEC 06-ROUGH IN STEVE BANKS CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 5/15/2022 10:43 PM Michael DePhillips <br /> Contact Name:Michael DePhillips <br /> Site Address:5409 S 2ND AVE <br /> Phone:4127208453 <br /> e-Mail:dephillipsmichael@gmail.com <br /> (5/16/2022 3:35 PM SKB) <br /> Move junction box above 16 inch insulation line in attic <br /> 5/19/2022 5/19/2022 ELEC 06-ROUGH IN STEVE BANKS APPROVAL as noted <br /> Notes: <br /> Contact Name:Michael DePhillips <br /> Site Address:5409 S 2ND AVE <br /> Phone:4127208453 <br /> e-Mail:dephillipsmichael@gmail.com <br /> (5/19/2022 3:45 PM SKB) <br /> Powder room and master bathroom. <br /> I <br /> Printed:Wednesday, 18 October,2023 2 of 4 rk <br /> SUPERION <br />