My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1525 75TH ST SW CASCADE COFFEE 2025-11-07
>
Address Records
>
75TH ST SW
>
1525
>
CASCADE COFFEE
>
1525 75TH ST SW CASCADE COFFEE 2025-11-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2025 10:26:22 AM
Creation date
10/7/2025 10:56:38 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1525
Tenant Name
CASCADE COFFEE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: E2504-019 Description: Relocate filler line 101 lighting portion-FULL SCOPE IN <br /> NOTE <br /> Applied:4/2/2025 Approved:4/2/2025 Site Address: 1525 75TH ST SW <br /> Issued:4/2/2025 Finaled: 7/9/2025 City,State Zip Code: EVERETT,WA 98203-7007 <br /> Status: FINALED Applicant: DICKSON ELECTRIC LLC <br /> Parent Permit: Owner:JOHNSON PROPERTIES I LLC <br /> Parent Project: Contractor: DICKSON ELECTRIC LLC <br /> Details: <br /> Provide and install(12) "UFO" style high bays in existing space. Provide and install new conduit and L6-20 twist lock receptacles and <br /> cord ends for lighting. Hang new lights from mounting hooks. Reuse existing switch leg and switch location for new lights. Provide <br /> new conduit and wiring where needed. <br /> Provide and install new Siemens 250 amp 277/480v main breaker panel on column H10 to feed (4)70 amp 3 phase and(2)20 amp <br /> circuits to filler lines. Install flexible connections at equipment electrical cabinet. Pull power from MDP location.approx. 500 ft away <br /> through factory warehouse. Provide and install 125 amp 120/208v main breaker sub panel on column H10. Provide and install(16) <br /> 120v 20 amp and(1)30 amp 3 phase circuits to various locations on filler line 101 and new filler line <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 4/18/2025 4/18/2025 ELEC 06-ROUGH IN PAUL WEILAND PARTIAL eTRAKiT Inspection Request <br /> APPROVAL <br /> Notes: <br /> 4/16/2025 3:06 PM DICKSON ELECTRIC LLC <br /> Contact Name:DICKSON ELECTRIC LLC <br /> Site Address:1525 75TH ST SW <br /> Phone:3605684572 <br /> e-Mail:info@dicksonelectricllc.com <br /> All systems are approved except for the grounding for the Autotrans. Building steel is not connected by any visible means to other building steel. <br /> Provide information to prove the building steel is an effective grounding system. <br /> #10 wire for ground must be protected from damage. <br /> 4/29/2025 4/29/2025 ELEC 06-ROUGH IN PAUL WEILAND APPROVAL eTRAKiT Inspection Request <br /> Notes: <br /> 4/28/2025 12:12 PM DICKSON ELECTRIC LLC <br /> Contact Name:DICKSON ELECTRIC LLC <br /> Site Address:1525 75TH ST SW <br /> Phone:3605684572 <br /> e-Mail:info@dicksonelectricllc.com <br /> Corrections made rough in approved <br /> I <br /> Printed:Tuesday,07 October, 2025 1 of 2 <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.