Laserfiche WebLink
LOADBANK TEST DATA SHEET FIELDAWAREJOB# <br /> UNIT NAME/NUMBER <br /> DATE: TEST PURPOSE: FUEL LEVEL: START: END: <br /> kW: PHASE: HERTZ: VOLTAGE: HOURS: BEFORE: AFTER: <br /> VOLTAGE AMPERAGE AMBIENT WATER EXHAUST FUEL <br /> MIN TEST TIME HOURMETER GEN.FREQ KW LOAD %LOAD PHASE 1 PHASE 2 PHASE 3 PHASE 1 PHASE 2 PHASE 3 TEMP OIL PRESS OIL TEMP TEMP TEMP PRESSURE <br /> START <br /> END <br /> WITNESS TO TEST: NAME: TITLE: <br /> SUBMITTED BY: NAME: CUMMINS <br /> COMMENTS <br /> UNLESS STATED OTHERWISE ON THIS DOCUMENT THE LOAD TEST WAS CONDUCTED AT UNITY POWER FACTOR,THUS KVA AND KW ARE EQUAL VALUES.WHEN TESTING FOR SPECIFICATION PURPOSES WE ARE <br /> UNABLE TO CONTROL AMBIENT CONDITIONS,ELEVATION AND FUEL QUALITY THUS THE DOCUMENTED RESULTS MAY DIFFER FROM EQUIPMENT DATA SHEETS AND TEST CELL REPORTS FROM MANUFACTURERS <br /> DATA.PLEASE SEE ALL ATTACHED DOCUMENTATION REGARDING THE SERVICES PERFORMED ON THIS EQUIPMENT. <br />