My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1123 RUCKER AVE 2025-11-03
>
Address Records
>
RUCKER AVE
>
1123
>
1123 RUCKER AVE 2025-11-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2025 11:13:32 AM
Creation date
10/8/2025 11:13:32 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
1123
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H&S Roofing/Waterproofing LLC <br /> 814 S Davies Rd �n <br /> Lake Stevens, WA 98258 « <br /> Andrew Harris (425) 366-0064 <br /> CUSTOMER: Alyssa Seal <br /> 1123 Rucker AVE <br /> Everett WA 98201 <br /> ESTIMATE NO: 1561 <br /> PROJECT NAME: Roof removal and installation of Malarkey Windsor Scotchgard PRESIDENTIAL <br /> Scope Of Work: <br /> NOTE: Landscaping will be carefully monitored and protected during the roof installation process. H&S will have an employee <br /> on ground to ensure landscaping isn't damaged. <br /> • Full removal of existing single layer roof system. <br /> • HOUSE: Installation of% "CDX plywood sheathing for roof system <br /> • GARAGE: Inspect for rot and replace with new%" CDX plywood where necessary <br /> • HOUSE: Bird blocks will be installed on every other bay beneath gutter <br /> • Metal flashings will be placed in all gutter locations and rakes. <br /> • Malarkey Secure start SG synthetic underlayment will be applied to the substrate. <br /> • Install Arctic Seal Ice and Water in all valley locations. (No valleys on garage) <br /> • Install W-valley metal in all valley locations. <br /> • Malarkey colored starter strip will be installed along perimeter of the house and garage roof top prior to <br /> 2nd layer of starter strip <br /> • Malarkey Smart Start asphalt shingles will be installed around the perimeter. <br /> • Malarkey Windsor Scotchgard Presidential will be installed. (Midnight Black) <br /> • Remove and replace vents and pipe flashings with new. Pipes will be Lead <br /> • Installation of ridge vent <br /> • 3 anchors will be installed on the house, and 2 on the garage <br /> • Full Gutter clean out <br /> • Dispose of all debris around perimeter of house <br /> * 5 year workmanship warranty will be provided on the day of roof completion & after the final <br /> invoice has been paid <br />
The URL can be used to link to this page
Your browser does not support the video tag.