My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
D.K. Systems, Inc. 10/6/2025 Change Order 3
>
Contracts
>
Agreement
>
On-Call (not construction)
>
D.K. Systems, Inc. 10/6/2025 Change Order 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2025 1:24:35 PM
Creation date
10/8/2025 1:24:26 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
D.K. Systems, Inc.
Approval Date
10/6/2025
End Date
10/25/2026
Department
Finance
Department Project Manager
Bert Cueva
Subject / Project Title
HVAC Services and Repairs
Amendment/Change Order
Change Order
Amendment/Change Order Number
3
Tracking Number
0003524
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
On-Call (not construction)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
D.K. Systems Inc. 10/25/2022
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Document emailed to Cassie Franklin (cfranklin@everettwa.gov) for signature <br />2025-10-02 - 6:59:05 PM GMT <br />Email viewed by Cassie Franklin (cfranklin@everettwa.gov) <br />2025-10-05 - 7:10:04 PM GMT <br />Document e-signed by Cassie Franklin (cfranklin@everettwa.gov) <br />Signature Date: 2025-10-05 - 7:10:16 PM GMT - Time Source: server <br />Document emailed to Marista Jorve (mjorve@everettwa.gov) for signature <br />2025-10-05 - 7:10:18 PM GMT <br />Document e-signed by Marista Jorve (mjorve@everettwa.gov) <br />Signature Date: 2025-10-06 - 4:47:34 PM GMT - Time Source: server <br />Agreement completed. <br />2025-10-06 - 4:47:34 PM GMT
The URL can be used to link to this page
Your browser does not support the video tag.