My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9001 AIRPORT RD BLDG 4 2025-10-27
>
Address Records
>
AIRPORT RD
>
9001
>
9001 AIRPORT RD BLDG 4 2025-10-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2025 9:45:58 AM
Creation date
10/10/2025 11:53:18 AM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
9001
Unit
BLDG 4
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
396
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SNO-ISLE TECH 2O23 SMALL WORKS Section 00 70 00, Page 68 <br />McGRANAHAN ARCHITECTS GENERAL CONDITIONS <br />.7 use its best efforts to sell any property of the types referred to in subparagraph 14.4.1.6. The <br />Contractor shall not be required to extend credit to any buyer, and may acquire any such property under <br />the conditions prescribed by and at a price or prices approved by the Owner, and the proceeds of any <br />such transfer or disposition may be applied in reduction of any payments to be made by the Owner to <br />the Contractor; <br />.8 take such action as may be necessary or as directed by the Owner to preserve and protect the <br />Work and property related to this Project in the possession of the Contractor in which the Owner has an <br />interest; and <br />.9 continue performance only to the extent not terminated. <br />14.4.2 The Contractor shall, from the effective Date of Termination until the expiration of three (3) J <br />i <br />years after final settlement under this Contract, preserve and make available to the Owner, at all <br />reasonable times at the office of the Contractor, and without charge to the Owner, all books, records, <br />documents, photographs and other evidence bearing on the costs and expenses of the Contractor under <br />this Contract and relating to the terminated or completed Work. <br />14.4.3 In arriving at any amount due the Contractor after termination, the following shall apply: <br />.1 The Contractor shall refund to the Owner any amounts paid by the Owner to the Contractor in <br />excess of costs reimbursable under paragraph 14.3. <br />.2 The damages and relief from termination by the Owner specifically provided in Article 14 shall <br />be the Contractor's sole entitlement in the event of termination. <br />END OF SECTION <br />mcg-ARC 2120.000 February 28, 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.