My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9001 AIRPORT RD BLDG 4 2025-10-27
>
Address Records
>
AIRPORT RD
>
9001
>
9001 AIRPORT RD BLDG 4 2025-10-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2025 9:45:58 AM
Creation date
10/10/2025 11:53:18 AM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
9001
Unit
BLDG 4
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
396
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SNO-ISLE TECH 2O23 SMALL WORKS Section 0120 00, Page 2 <br />McGRANAHAN ARCHITECTS PAYMENT PROCEDURES <br />6. Include a separate line item for Commissioning equal in value to the effort required by the General <br />Contractor and all subcontractors to participate in commissioning activities as set forth in the project <br />manual. In no case shall this amount be less than 1 % of the Contract Sum. <br />7. For any line item of installed value exceeding $20,000, show breakdown by major products or operations. <br />8. Round -off figures to nearest dollar amount. <br />9. Make sum of total scheduled costs equal to Contract Sum. <br />10. Coordinate Schedule of Values submittal with Construction Progress Schedule submittal. <br />11. List separate line item at end of Schedule of Values equal to 1% of each portion of the contract for project <br />closeout as defined in Division 1 - Closeout Submittals and Procedures. <br />12. See General Conditions for other schedule of values requirements. <br />C. Revise schedule to list approved Change Orders, with each Application for Payment. <br />1.05 INITIAL PAYMENT APPLICATION <br />A. The principal administrative actions and submittals which must precede or coincide with submittal of first <br />Payment Application can be summarized as follows: <br />1. Statements of Intent to Pay Prevailing Wages on Public Works Contract from General Contractor and <br />Subcontractors. <br />2. Schedule of Values: Schedule shall be used as the basis for General Contractor's and subcontractors' <br />Application for Payment. <br />3. List of subcontractors and major material suppliers. <br />4. Schedule of Unit Prices, as applicable. <br />5. Schedule of Submittals (preliminary if not final). Final must be submitted and approved prior to second <br />payment application. <br />6. Listing of General Contractor's staff assignments: Superintendent and Project Manager and emergency <br />contact numbers. <br />7. Copies of acquired building permits and similar authorizations and licenses from governing authorities for <br />current performance of the work. <br />8. Initial progress report <br />9. Performance and Payment Bonds. <br />10. Certificate of Insurance. <br />11. Preliminary Construction Progress Schedule. A final Construction Progress Schedule must be submitted <br />and approved prior to second payment application. <br />1.06 APPLICATIONS EACH MONTH DURING CONSTRUCTION <br />A. Submit itemized application, in number of copies specified below, each with General Contractor's notarized <br />affidavit and signed receipts from principal subcontractors and suppliers as specified below. <br />B. General Contractor shall review draft of application with Architect at progress meeting one week prior to <br />submittal. <br />mcg-ARC 2120.000 February 28, 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.