My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9001 AIRPORT RD BLDG 4 2025-10-27
>
Address Records
>
AIRPORT RD
>
9001
>
9001 AIRPORT RD BLDG 4 2025-10-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2025 9:45:58 AM
Creation date
10/10/2025 11:53:18 AM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
9001
Unit
BLDG 4
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
396
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SNO-ISLE TECH 2O23 SMALL WORKS <br />McGRANAHAN ARCHITECTS <br />Section 0140 00, Page 1 <br />QUALITY REQUIREMENTS <br />QUALITY REQUIREMENTS <br />PART 1 GENERAL <br />1.01 SECTION <br />INCLUDES <br />A. <br />4 <br />Quality assurance submittals: <br />1. Manufacturer's instructions and recommendations. <br />s2. <br />Coordination drawings and pre -work conferences. <br />B. <br />Control of installation: <br />Y <br />1. Tolerances. <br />2. Manufacturer's field services. <br />3. Defect assessment and replacement. <br />1.02 RELATED SECTIONS <br />A. <br />Division 0 — General Conditions: Additional requirements. <br />B. <br />Division 1 - Administrative Requirements: Submittal procedures. <br />C. <br />Division 1 - Reference Standards. <br />D. <br />Division 1 - Product Requirements: Requirements for material and product quality. <br />1.03 SUBMITTALS <br />A. <br />Manufacturer's Instructions: When specified in individual specification sections, submit printed instructions for <br />delivery, storage, assembly, installation, start-up, adjusting and finishing, for the owner's information. Indicate <br />special procedures, perimeter conditions requiring special attention and special environmental criteria required <br />for application or installation. <br />B. <br />Coordination Drawings: Submit drawings for Architect's benefit and for the owner's information. <br />1. Submit for the purpose of indicating coordination of work items among the several trades. <br />2. Neither Architect nor Consulting Engineers will take action on coordination drawings. <br />— C. <br />Pre -work Conferences: schedule and administer as required as noted and in section 01 10 50 Project Meetings. <br />PART 2 PRODUCTS — NOT USED <br />PART 3 EXECUTION <br />3.01 CONTROL OF INSTALLATION <br />A. <br />I <br />Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to <br />, <br />produce Work of specified quality. <br />B. <br />Comply with manufacturers' instructions, including each step-in sequence. <br />C. <br />Should manufacturers' instructions conflict with Contract Documents, request clarification from Architect before <br />proceeding. <br />D. <br />Comply with specified standards as minimum quality for the Work except where more stringent tolerances, <br />codes, or specified requirements indicate higher standards or more precise workmanship. <br />E. <br />Have Work performed by persons qualified to produce required and specified quality. <br />— F. <br />Verify that field measurements are as indicated on shop drawings or as instructed by the manufacturer. <br />mcg-ARC 2120.000 February 28, 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.