My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9001 AIRPORT RD BLDG 4 2025-10-27
>
Address Records
>
AIRPORT RD
>
9001
>
9001 AIRPORT RD BLDG 4 2025-10-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2025 9:45:58 AM
Creation date
10/10/2025 11:53:18 AM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
9001
Unit
BLDG 4
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
396
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SNO-ISLE TECH 2O23 SMALL WORKS <br />McGRANAHAN ARCHITECTS <br />Section 00 30 00, Page 1 <br />BID FORM <br />L) <br />} <br />TO: BOARD OF DIRECTORS <br />MUKILTEO SCHOOL DISTRICT NO. 6 <br />EVERETT, WASHINGTON <br />SNO-ISLE TECH 2O23 SMALL WORKS <br />To Be Submitted by March 28, 2023 <br />Pursuant to and in compliance with the Invitation to Bid and the Instructions to Bidders, and to other documents relating <br />thereto, the Undersigned hereby proposes to furnish all labor and materials and to perform all Work for, as requested by <br />and in strict accordance with the Contract Documents, including without limitation any and all Specifications, Schedules <br />and Drawings, and with all addenda, for the following sum: <br />A. BASE BID: For the Base Bid as defined in the Contract Documents, the sum of: <br />(in text) <br />in numbers <br />I. TRENCH SAFETY: Not applicable. <br />2. EXPECTED COST OF ACHIEVING APPRENTICESHIP UTILIZATION GOALS: Included within <br />the above Base Bid is the amount of $ for costs expected to be incurred <br />associated with achieving the apprenticeship utilization goals stated in Specification 00 09 00 — <br />APPRENTICESHIP UTILIZATION. <br />B. ALTERNATE BIDS AND UNIT PRICES: <br />I. ALTERNATE BIDS: Undersigned proposes to perform the Alternates as described in the Contract <br />Documents, and subject to the same conditions as indicated in paragraphs C through L of the Form of <br />Bid for the following additions to or deductions from the Base Bid price: <br />ALTERNATE NO. & TITLE <br />ADDITIONS OF (DEDUCTIONS) <br />P1.1 <br />Light Fixtures for Diesel Tech High -bay <br />P 1.2 <br />Light Fixtures for Machine Tech Shop <br />P1.3 <br />Light Fixtures for Covered Area <br />P2.1 <br />Installation of Single -ply Membrane Roof <br />P3.1 <br />Supplemental Cooling for Computer Tech <br />Labs <br />$ <br />2. UNIT PRICES: Not Applicable <br />mcg-ARC 2120.000 February 28, 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.