Laserfiche WebLink
PERMIT APPLICATION INFORMATION—.,-�E8 z o 2024 <br />CITY C)F FVFRFTT <br />CONSTRUCTION MANAGER/PA/PM: <br />Carson Hornor/Kyle Bringedahl/Pamela TuRermit Services <br />PROJECT NAME: <br />737 N. Line 40-26 Engine Offload <br />LOCATION (BLDG/FLR/COL): <br />40-26 First Floor, Col. P.5 & 6 <br />PROJECT TIMELINE & PERMIT NEED DATE: <br />5/13/24 (12 weeks from 2/20/24) <br />MAXIMO JOB #: <br />W9415344 <br />CHARGELINE #: <br />66=1514005=DTLCAP6623RR45=CIPLOR8J=X=CR=389S=699 <br />CONTRACT PRICE OF WORK BEING <br />PERMITTED: <br />$130,000 <br />CONTRACTOR NAME: <br />Skanska USA Building Inc. <br />CONTRACTOR E-MAIL <br />Jason.Floyd@skanska.com <br />CONTRACT STATE LISC #: <br />SKANSUB985RT <br />CONTRACTOR CITY OF EVERETT LISC #: <br />044389 <br />BRIEF OVERVIEW OF PROJECT SCOPE: <br />(Do not include electrical and mechanical <br />scope and costs. Contractors will secure <br />these permits) <br />The scope of work covered in the 737 N. Line 40-26 Engine <br />Offload is to install concrete foundations and structure to <br />support an overhead crane and hoist for offloading airplane <br />engines. <br />IN ADDITION TO PROVIDING THE ABOVE INFORMATION, PLEASE INCLUDE THE FOLLOWING <br />DOCUMENTATION AS REQUIRED: <br />For building permits, include (1) site plan), (2) full size drawing sets, (1) set of structural calcs, and any <br />applicable energy code forms <br />For pallet rack installations, include (1) site plan, (2) copies of Existing/Proposed layouts and (2) sets of <br />structural calculations. <br />For Public Work permits, include (1) site plan, (4) full size drawing sets and (2) sets of drainage calcs. <br />For questions, please contact Todd Haberlack at 425-260-2668 or via email at todd.i.haberiack@boeing.com <br />