My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
David Evans and Associates, Inc. 10/10/2025
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
David Evans and Associates, Inc. 10/10/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2025 2:49:31 PM
Creation date
10/10/2025 2:48:53 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
David Evans and Associates, Inc.
Approval Date
10/10/2025
Council Approval Date
10/1/2025
End Date
2/28/2027
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Engineerng Services for Transit Everett Station cabinet charger installation
Tracking Number
0004983
Total Compensation
$131,766.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett <br />Everett Station Plug-In Bus Chargers Dimitri Siaterlis Dean Ralphs Curtis Smith Derek Rajah Angel Venegas Shay Witten <br />Total <br />Hours <br />18-Sep-25 <br />Project <br />Manager QA/QC Jr. Manager- <br />Sr. Designer EE Designer I AutoCAD Admin <br />DEA Billing Rate (2025)$301 $320 $207 $150 $152 $114 <br />Task #Scope of Services <br />1 Project Management (internal)16 12 28 <br />1.1 Project Administration (internal)12 12 <br />1.2 QA/QC (internal)8 8 <br />1.3 Bi-weekly Team Coordination Meetings with City Staff 16 16 <br />2 Electrical Engineering and Design <br />2.1 Prepare site and building electrical plan showing two plug-in electrical vehicle <br />charging stations including one-line, electrical site plan, switchgear and equipment <br />layout, schedules, details, and ROM construction estimate. Submittals include 50%, <br />and 100%. <br />12 24 24 60 <br />2.2 Engineering calculations include load analysis, voltage drop and short circuit <br />calculations.3 12 12 27 <br />2.3 Project coordination including site visit, coordination with Everett Transit, <br />Snohomish PUD and ChargePoint.12 16 16 44 <br />3 Construction Bid Documents <br />3.1 Provide construction bid document deliverables including specifications and final <br />signed and sealed drawings for IFB.8 8 24 8 24 72 <br />4 Construction Management <br />4.1 Review electrical submittals and respond to RFIs.4 16 8 28 <br />4.2 Four (4) Onsite visits during construction.16 16 <br />4.3 Change order management including reviewing and responding to contractor <br />requests for field modifications as requested.4 8 8 20 <br />4.4 Assist with final acceptance testing, project closeout and document transfer.4 12 8 24 <br />Total Hours 79 16 128 44 56 32 355 <br />Total Cost by Staff $23,779 $5,120 $26,496 $6,600 $8,512 $3,648 $74,155 <br />Expenses Mileage:$1,000 <br />David Evans and Associates, Inc's Subtotal Budget (Not to Exceed)$75,155 <br />Management Reserve (Used Upon Pre-Approval by Everett Transit)$5,000 <br />Civil Subconsultant KPFF Engineers $49,626 <br />4% OH on KPFF's Fee Proposal $1,985 <br />Total Project Budget (Not to Exceed)$131,766
The URL can be used to link to this page
Your browser does not support the video tag.