Laserfiche WebLink
From: Scott Schreffler <br /> Sent: Friday, November 8, 2024 11:13 AM <br /> To: ssttl205@hotmail.com <br /> Subject: Everett building permit B2410-052 <br /> I am reviewing your application for an inspection. The floor plan you submitted does not show the <br /> requirements for an Adult Family Home. Before an inspection occurs,the home should have all the <br /> requirements of the AFH. The checklist you submitted is only the signature page. There are many other <br /> pages of the checklist that the inspectors will use during the inspection. This work need to be <br /> completed before the inspection. <br /> Following is a link to the required documents: Adult-family-home-checklist-PDF <br /> Please prepare plans showing these requirements and submit for review. <br /> Following is a tip sheet on the process: https://everettwa.gov/DocumentCenter/View/25522/Adult- <br /> family-home-WABO-inspections-PDF <br /> Your permit review is on hold until we receive this information. <br /> Let me know if you need any questions. <br /> — Scott Schreffler, Registered Architect <br /> Senior Building Plans Examiner I Permit Services <br /> 425.257.8810 1 3200 Cedar Street, 2nd Floor, Everett, WA 98201 <br /> EVERETT Phone Hours: M-F: 8:30 a.m.—12 p.m & 1 p.m.—3 p.m. <br /> everettwa.gov/permits I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant <br /> to the Public Records Act. <br />