Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: P2203-014 Description: PLUMBING FOR 3-COMPARTMENT SINK, <br /> Applied:3/8/2022 Approved: 6/28/2022 Site Address: 35 SE EVERETT MALL WAY#103 <br /> Issued:7/1/2022 Finaled: 7/20/2022 City,State Zip Code: EVERETT,WA 98208 <br /> Status: FINALED Applicant:YUSUPHA BOJANG <br /> Parent Permit: B2203-022 Owner:TOP HILL PLAZA LLC <br /> Parent Project: Contractor:TENANT W/LETTER <br /> Details: <br /> MPO SINK,AND HAND SINK <br /> PLUMBING FOR 3-COMPARTMENT SINK, <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 7/5/2022 7/5/2022 PLUMB 031--ROUGH BILLY APPLETON NOT READY <br /> Notes: <br /> Contact Name:YUSUPHA BOJANG <br /> Site Address:35 SE EVERETT MALL WAY#103 <br /> Phone:2064125532 <br /> e-Mail:YUSUBOJANGI@GMAIL.COM <br /> (7/5/2022 9:13 AM BGA) <br /> bga changed Inspection Type from PLUMB 08-FINAL to PLUMB 03-ROUGH IN <br /> (7/5/2022 9:19 AM BGA) <br /> 1.Owner must expose all water piping and waste and vent piping inside walls for inspection before calling for final.All plumbing fixtures and grease <br /> trap must be installed per UPC code after rough in inspection has been approved,and then called in for separate final inspection. <br /> 7/13/2022 7/13/2022 PLUMB 03-ROUGH JASON CORRECTION <br /> IN MORRISSEY REQUIRED <br /> Notes: <br /> Contact Name:YUSUPHA BOJANG <br /> Site Address:35 SE EVERETT MALL WAY#103 <br /> Phone:2064125532 <br /> e-Mail:YUSUBOJANGI@GMAIL.COM <br /> (7/13/2022 11:02 AM JJM) <br /> Remove downstream p trap as fixtures cannot be double trapped.Per UPC <br /> Rotate HGI 180 degrees so internal flow control is on the inlet. <br /> Center trap under three compartment meant sink per UPC with indirect hub drain per UPC code and health department requirements. <br /> Replace 2"medium turn 90 with long turn 90 per UPC chapter 7. <br /> Add 11/2"studor vent on trap arm before grease interceptor. <br /> *** Make sure HGI is installed per manufacturers instructions for proper function. <br /> *** Make sure system drains properly before inspection. <br /> I <br /> Printed: Monday, 13 October,2025 1 of 2 rk <br /> SUPERION <br />