My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3015 9TH ST BLDG 4 2025-11-06
>
Address Records
>
9TH ST
>
3015
>
BLDG 4
>
3015 9TH ST BLDG 4 2025-11-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2025 11:22:04 AM
Creation date
10/13/2025 3:17:47 PM
Metadata
Fields
Template:
Address Document
Street Name
9TH ST
Street Number
3015
Tenant Name
BLDG 4
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
51.5276 <br /> GEOT E S T I O' @k Harbor <br /> Bellingham I Arlington Oak Harborr <br /> vvww.geotest-i nc.com <br /> LATERAL FRAMING INSPECTION REPORT <br /> PROJECT: Rivers Landing JOB#: 22-1005 <br /> ADDRESS: 3015 9th Street, Everett,WA REPORT#: LF003 <br /> PERMIT#: B2211-064 DATE: 2/2/2023 <br /> CLIENT: Williams Investments PAGE#: 1 of 2 <br /> CONTRACTOR: Exxel Pacific INSPECTOR: Ben Fox <br /> Item(s) Inspected/Location Conforming/Non-Conforming <br /> 5/8"Gypsum Board Fastening Conforming <br /> Reference Drawings: Emails provided by GC Engineer on 1/26/2023 <br /> Components Comments <br /> Framing grade,species,size, spacing ❑ <br /> Structural panel grade,thickness, nail size and pattern ❑ <br /> Hold down type, location,fasteners ❑ <br /> Sill anchorage,spacing,size, Plate washers ❑ <br /> Top plate connection to joist, blocking,truss ❑ <br /> Diaphragm chord,drag strut, braces and related ❑ <br /> Other V 5/8"CertainTeed Gypsum Board,Fastening per Email <br /> Building Summary <br /> Level/Sector Special Inspection Status to Date Outstanding Item Ref. <br /> North and East Walls Complete None <br /> Comments: GeoTest was onsite as requested to perform inspections of the fastening of the <br /> gypsum board on the north/east walls of the fire-damaged building. Additional fastening was <br /> added and met the requirements provided by GC Engineering. <br /> COPIES:caseyd@exxelpacific.com,IanM@exxelpacific.com,MattT@exxelpacific.com,ryan@williamsinvest.com r Reviewed by <br /> This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.