Laserfiche WebLink
51.5276 <br /> GEOT E S T I O' @k Harbor <br /> Bellingham I Arlington Oak Harborr <br /> vvww.geotest-i nc.com <br /> Inspection Report <br /> PROJECT: Rivers Landing JOB#: 22-1005 <br /> ADDRESS: 3015 9th Street, Everett,WA REPORT#: IR001 <br /> PERMIT#: B2211-064 DATE: 2/14/2023 <br /> CLIENT: Williams Investments PAGE#: 1 of 2 <br /> CONTRACTOR: Exxel Pacific INSPECTOR: Suzie Miller <br /> INSPECTION OF:Staircase Post Pipe Pile Installation <br /> GeoTest was on site, as requested to observe the installation of 2-inch diameter pipe piles for <br /> staircase 6A for Building 6 at the above-referenced address. <br /> The pipe piles consisted of 5-foot, 4-inch pipe sections that were driven with a 140-pound <br /> Rhino PB 140 hammer. Slip couplers were used to connect pipe sections. The piles were <br /> driven until a refusal was achieved at a rate of 60 seconds or more per inch of penetration for <br /> three consecutive times. <br /> A total of 10 pipe piles were installed during our site visit. All piles were installed vertically. All <br /> of the piles were driven beyond the minimum embedment depth of 6 feet. The approximate pile <br /> depths are given in Table 1. <br /> GeoTest will return for further observation and inspection as requested. <br /> COPIES:caseyd@exxelpacific.com,IanM@exxelpacific.com,MattT@exxelpacific.com,ryan@williamsinvest.com Reviewed by <br /> This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. <br />