Laserfiche WebLink
RIVERS LANDING REMEDIATION/PROJECT#2106-1016 <br /> REPORT#13 <br /> Item #1 Location: Bldg 4 1 North Elevation <br /> ❑ACTION ITEM ❑NOT TO DETAIL ❑REMINDER <br /> The cladding has been completely removed, and Tyvke Commercial Wrap D has been installed. The WRB system has <br /> been installed according to industry best practices. The following items were noted at the visit. <br /> ` MM <br /> DOW <br /> •_ - r LLLIII � , <br /> __ _ � ...W...b _ o•.ow,..9a:rv�w omirti:uY,•,•�.. A <br /> �.w N <br /> 1-1 1-2 <br /> i <br /> I� <br /> 1 <br /> i <br /> 1-3 1-4 <br /> B.E.E.Consulting 170 W.Dayton St.,Suite 206,Edmonds,WA 98020 <br /> PH:(425)672-3900 FAX:(425)712-8608 2 1 7 <br />