My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1724 100TH ST SW 2025-11-07
>
Address Records
>
100TH ST SW
>
1724
>
1724 100TH ST SW 2025-11-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2025 1:34:57 PM
Creation date
10/14/2025 10:47:29 AM
Metadata
Fields
Template:
Address Document
Street Name
100TH ST SW
Street Number
1724
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: PW2207-022 Description:SITE WORK FOR DAKOTA WAY BLA-LOT B <br /> Applied:7/29/2022 Approved:3/16/2023 Site Address: 1724&1726 100TH ST SW <br /> Issued:3/17/2023 Finaled: 10/3/2023 City,State Zip Code: EVERETT,WA 98204 <br /> Status: FINALED Applicant: ELDEN MCCALL PE <br /> Parent Permit: Owner:AMA VENTURES LLC <br /> Parent Project: REVI22-022 Contractor: GPA ENTERPRISES INC <br /> Details: <br /> SITE WORK FOR DAKOTA WAY BLA-LOT B <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> TORMWATER S R <br /> FINAL <br /> WALKTHROUGH PW INSPECTOR <br /> WITH PW/SW <br /> INSPECTOR <br /> Notes: <br /> PW 08-FOOTING <br /> 3/30/2023 3/30/2023 DRAIN/POSITIVE JIM KNAPPERT APPROVAL eTRAKiT Inspection Request <br /> DRAIN <br /> Notes: <br /> 3/29/2023 9:15 AM GPA ENTERPRISES INC <br /> Contact Name:GPA ENTERPRISES INC <br /> Site Address:1724&1726 100TH ST SW <br /> Phone:4255082465 <br /> e-Mail:PAVELGPA@GMAIL.COM <br /> 9/26/2023 9/26/2023 PW 24-FIRE DEPT BRONSON APPROVAL <br /> SITE FINAL PEARSON <br /> Notes: <br /> 9/25/2023 5:48 PM GPA ENTERPRISES INC <br /> Contact Name:GPA ENTERPRISES INC <br /> Site Address:1724&1726 100TH ST SW <br /> Phone:4255082465 <br /> e-Mail:PAVELGPA@GMAIL.COM <br /> 9/27/2023 AM 1 9/27/2023 17:45 NPDES FINAL Andy Erickson APPROVAL <br /> AM INSPECTION <br /> Notes: <br /> APPROVED:All post-construction SWPPP elements have been adequately addressed.The site is fully stabilized; LID BMPs are protected from siltation <br /> and compaction;all stormwater facilities are installed as designed and functioning;and all temporary construction BMPs have been removed or <br /> restored for long-term protection. <br /> I <br /> Printed:Tuesday,03 October, 2023 1 of 2 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.