My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000 TOWER ST BASE FILE 2025-12-12
>
Address Records
>
TOWER ST
>
2000
>
BASE FILE
>
2000 TOWER ST BASE FILE 2025-12-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2025 11:02:51 AM
Creation date
10/15/2025 8:44:27 AM
Metadata
Fields
Template:
Address Document
Street Name
TOWER ST
Street Number
2000
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS Permit Number: PW2504-026 <br /> PERMIT Permit Type: PUBLIC WORKS <br /> Permit Subtype: MINOR SITE WORK(UNDER <br /> E V E R E T T City of Everett Permit Services 2000SF HARD SURFACE) <br /> WASHINGTON Permit5ervices@everettwa.gov 1425.257.8810 Date Issued: 5/8/2025 <br /> Request Inspections:OnlinePermits.everettwa.gov <br /> PERMIT CONDITIONS: <br /> CONDITION TYPE CONDITION DETAILS <br /> INSPECTION SCHEDULING Inspections are required for all stages of construction and shall be scheduled online.Visit the City's online Permitting <br /> Portal at https://onlinepermits.everettwa.gov to formally request all required inspections.Available inspection dates are <br /> shown in the dropdown menu. <br /> CITY STANDARDS All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications for Development. <br /> CALL BEFORE YOU DIG Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> APPROVED PLANS TO REMAIN ON SITE Approved plans must remain on job site at all times.All work shall be constructed per the plans approved by the City of <br /> Everett Permit Services. <br /> EROSION CONTROL(TESC) Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector <br /> and the approved SWPPP/TESC Plan.Remove upon completion of the project prior to final approval of the permit. <br /> MANAGE STORMWATER RUNOFF It is the applicant/owners responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be <br /> managed on-site in a manner that does not adversely affect neighboring properties,including the City's right-of-way <br /> and/or easements and the improvements located therein. <br /> PROTECT UTILITIES Protect all existing underground utilities during construction. <br /> REPLACE DAMAGED IMPROVEMENTS Any damage to City improvements(sidewalk,curb,roadway,etc.)shall be replaced per City Standards and/or as directed <br /> by the City PW Inspector. <br /> ROW CONDITIONAL USE All work constructed within the public right-of-way must be removed or relocated at the owners expense if the City ever <br /> requires use of the right-of-way for municipal purposes. <br /> STREET CLEANING Keep City streets clean at all times.No dirt,mud,rocks,or debris to be tracked onto roadway. <br /> PW SITE FINAL This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy.Request a final inspection <br /> online by selecting PW 25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests when all <br /> items have been completed for this permit. <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant hereby agrees to hold and save harmless the City of Everett from any and all claims for <br /> damages,costs,expenses,or causes of action that may arise because of installation and maintenance of the improvement or other right-of-way use here to <br /> applied for and further agrees to remove same upon notice from the City and to replace public property damaged thereby. <br /> VALIDITY/EXPIRATION: <br /> Work authorized by this permit must be started within 180 days of date permit is issued and thereafter is to be diligently pursued to completion.This permit <br /> may be canceled by the city upon any stoppage of work on this project over 180-day duration.Each inspection extends the expiration date 180 days to keep the <br /> permit open while work is active. <br /> EVERETT Permit Number: PW2504-026 Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.