My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4849 SPIRE LN 2023 Geotech Report 2025-10-15
>
Address Records
>
SPIRE LN
>
4849
>
Geotech Report
>
4849 SPIRE LN 2023 Geotech Report 2025-10-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2025 2:17:06 PM
Creation date
10/15/2025 2:08:47 PM
Metadata
Fields
Template:
Address Document
Street Name
SPIRE LN
Street Number
4849
Permit
B2305-034
PW2303-022
Year
2023
Notes
TEMP FOUNDATION SUPPORT FOR REMOVAL OF CONTAMINATED SOIL. EXCAVATE 400CY PETROLEUM CONTAMINATED SOIL INSTALL PIN PILES
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Remedial Excavation: 4849 Spire Lane, Everett, WA <br />December 8, 2022 <br />not become evident until construction. If variations do appear, PanGEO should be <br />requested to reevaluate the recommendations in this report and to modify or verify them in <br />writing prior to proceeding with earthwork and construction. <br />GROUNDWATER <br />Groundwater was not encountered in our test pit progressed up to 12 feet below existing <br />grade at the time of our test pit exploration on September 28, 2022. In addition, no <br />groundwater was noted up to 35 feet below existing grade in the direct push probes <br />progressed on March 22, 2022. It should be noted that groundwater levels may vary <br />depending on the season, local subsurface conditions, and other factors. In general, the <br />water level is the highest and the seepage rate in the greatest during the winter and early <br />spring (typically October through May). <br />GEOTECHNICAL RECOMMENDATIONS <br />Several different excavation alternatives were considered to protect the existing structure <br />from potential damage during the excavation activities. One option is to utilize a temporary <br />shoring system, such as a solider pile wall, to provide stability to the walls of the remedial <br />excavation. Alternately, we understand the preferred option, which is anticipated to be the <br />most cost-effective, is to underpin the foundation of the existing residence adjacent to the <br />proposed excavation with small diameter driven pipe piles to mitigate the potential adverse <br />effects the excavation adjacent to the house could have on the foundation. <br />Once the existing foundation is underpinned, the soils can be excavated out adjacent to the <br />foundation. However, because we anticipate the upper 4 feet of soil to consist of loose to <br />medium dense poorly graded to well graded sand, some sloughing of the near -vertical <br />excavation could occur, which could result in the loss of soil below the footings or floor <br />slab of the building. To reduce the potential of significant sloughing, the excavation could <br />be performed in narrow slot cuts, on the order of 4 feet wide, or narrower, perpendicular to <br />the building footing, and immediately backfilled with controlled density fill (CDF). <br />UNDERPINNING EXISTING FOUNDATION — DRIVEN PIPE PILES (PIN PILES) <br />To provide support for the existing structure during the planned remedial excavation, which <br />will occur directly adjacent to the south wall of the existing residence, we recommend <br />22-389 4849 spire lane evere1 _rpt.docx Page 5 PanGEO, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.