My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3415 HOYT AVE 2025-11-04
>
Address Records
>
HOYT AVE
>
3415
>
3415 HOYT AVE 2025-11-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2025 10:36:29 AM
Creation date
10/16/2025 3:09:12 PM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
3415
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date Applied: 10/16/2024 <br /> City of Everett Permit Services Public Works Permit#: PW2410-011 <br /> 3200 Cedar Street, 2"d Floor Associated Bldg Permit#: <br /> EVERETT Everett, WA 98201 Planning Reference#: <br /> everettwa.gov/permits Public Works Fee: $65.00 <br /> WASHINGTON PermitServices@everettwa.gov Schedule Inspections at:onlinepermits.everettwa.gov <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> BROWN LAINA R BROWN LAINA R <br /> 3501 HOYT PO BOX 12844 <br /> EVERETT,WA 98201 EVERETT,WA 98201 <br /> PHONE: PHONE:4253432828 <br /> SITE ADDRESS:341S&3413 HOYT AVE TAX PARCEL ID#:00436982300800&00436982300700 <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> DESCRIPTION:Site work associated with CE24-0959. <br /> NOTES: Installation of 6-foot pedestrian guard in right-of-way. <br /> PERMIT CONDITIONS: <br /> 1. All inspections shall be scheduled online at https://onlinepermits.everettwa.gov.Available inspection dates are shown in the <br /> dropdown menu. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. The pedestrian guard shall be not greater than 6 feet in height within the abutting right-of-way. <br /> 5. Protect all existing underground utilities during construction. Guard posts shall be at least 2ft away from any underground utility. <br /> 6. Any damage to City improvements(alley, roadway,etc.)shall be replaced per City Standards and/or as directed by the City PW <br /> Inspector. <br /> 7. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at onlinepermits.everettwa.gov to <br /> formally request all required inspections. <br /> 8. Guard constructed within the public right-of-way must be removed or relocated at the owner's expense if the City requires use of the <br /> right-of-way for municipal purposes. <br /> 9. A gap of no greater than four(4) inches shall be permitted between the ends of the fence run and existing <br /> fence/guard/walls/structures which currently restrict reasonable access of the public. <br /> 10. If guard is removed,damaged, or otherwise made ineffective in restricting the public's reasonable access to adjacent wall,the owner <br /> shall be responsible for immediately repairing or providing an alternative pedestrian guard consistent with City of Everett'Design and <br /> Construction Standards and Specifications'section 3-15.3. <br /> 11. Concrete post bases shall be installed per the details included in the approved plan set. If desired,the applicant may submit <br /> alternative post base designs for consideration which must meet or exceed the permitted designs. <br /> 12. Keep City right-of-way improvements clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> 13. The public alleyway shall be kept accessible to vehicles, pedestrians, and bicyclists unless approved by the City. Interruption to the <br /> accessibility of the public right-of-way shall require a Traffic Street Use(TSU) permit obtained from the City's Traffic Engineering <br /> Division.This permit can be applied for online at onlinepermits.everettwa.gov and requires a traffic control plan to be submitted for <br /> the area of requested closure.Allow 2 weeks for TSU permit issuance from the date of complete application. <br /> 14. A minimum pavement width of 20 feet of pavement shall be maintained between the guard face and the driving aisle measurement <br /> line created by the westernmost face of adjacent utility poles. See approved plans for details. <br /> 15. Gate(s)shall not open towards the alleyway. Gate(s)shall remain locked except if enclosed area is actively in use by the owner <br /> and/or their representative. <br /> 16. This permit must be finaled to close out this permit. Request a final inspection online by selecting PW 25-Site Final/Permit Close Out <br /> within the Online Permitting Portal Inspection Requests for this permit when all items have been completed. <br /> Page 1 of 2 <br /> —APPLICANT/JOB SITE COPY _ADDRESS FILE _TREASURER <br />
The URL can be used to link to this page
Your browser does not support the video tag.