My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1606 SE EVERETT MALL WAY 2025-11-04
>
Address Records
>
SE EVERETT MALL WAY
>
1606
>
1606 SE EVERETT MALL WAY 2025-11-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2025 8:01:38 AM
Creation date
10/17/2025 3:25:18 PM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1606
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: B2504-077 Description:wall repair from vehicle impact <br /> Applied:4/24/2025 Approved: 5/16/2025 Site Address: 1606 SE EVERETT MALL WAY <br /> Issued:5/16/2025 Finaled: City,State Zip Code: EVERETT,WA 98208-2835 <br /> Status: PERMIT ISSUED-ONLINE Applicant:tim Lyon <br /> Parent Permit: Owner: PACHYDERM PROPERTIES LLC <br /> Parent Project: Contractor: BLUSKY RESTORATION CONTR LLC <br /> Details: <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 6/13/2025 6/13/2025 BLDG 08-FRAMING Darold Phinney CORRECTION see note <br /> REQUIRED <br /> Notes: <br /> 6/11/2025 9:15 AM BLUSKY RESTORATION CONTR LLC <br /> Contact Name:BLUSKY RESTORATION CONTR LLC <br /> Site Address:1606 SE EVERETT MALL WAY <br /> Phone:4255152634 <br /> e-Mail:TIM.LYON@GOBLUSKY.COM <br /> Framing and hold downs are not per plan,please get a letter from the engineer giving the ok for current framing.I understand that there was no <br /> damage to the west 4'section of the building,still have to inspect per plan drawings. <br /> An electrical permit will need to be issued as well. <br /> 6/27/2025 6/27/2025 BLDG 08-FRAMING I Darold Phinney I APPROVAL See notes <br /> Notes: <br /> TIM 425-515-2634 <br /> Contractor has emailed documentation for the engineering approval for the damaged building. Attached to the permit. <br /> Electrical rough in inspection has also been approved. Ok to proceed <br /> 7/1/2025 7/1/2025 BLDG 12 Darold Phinney APPROVAL approved per plan <br /> INSULATION <br /> Notes: <br /> 6/27/2025 9:42 AM BLUSKY RESTORATION CONTR LLC <br /> Contact Name:BLUSKY RESTORATION CONTR LLC <br /> Site Address:1606 SE EVERETT MALL WAY <br /> Phone:7206146901 <br /> e-Mail:TIM.LYON@GOBLUSKY.COM <br /> ok to cover.electric rough in has been approved <br /> 7/3/2025 7/3/2025 BLDG 07-EXTERIOR Darold Phinney APPROVAL See notes <br /> SHEAR <br /> Notes: <br /> While on site for insulation inspection today,I added a exterior shear nailing inspection and approved exterior to be covered. I spoke with the <br /> contractor on the phone,and he stated that they were planning on getting started with the stucco exterior next week. <br /> I <br /> Printed: Monday, 21 July, 2025 1 of 2 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.