Laserfiche WebLink
PROJECT NAME SHEET# <br /> DEI WILDREED APTS - DECK REPAIRS <br /> DIBBLE ENGINEERS INC PROJECT# DATE <br /> www.dibbleengineers.com 23-107 <br /> tong Market Street,Kirkland,WA 98033 SUBJECT BY <br /> 425.828,4200 DESIGN CRITERIA& LOADS <br /> WATERPROOFING <br /> MEMBRANE OVER <br /> PLYWOOD SHEATHING <br /> 2x10 JOIST @ <br /> 16"OC <br /> (2) LAYERS <br /> 5/8" GWB <br /> VINYL SOFFIT <br /> FLOOR ASSEMBLY WEIGHTS: <br /> WATERPROOFING MEMBRANE = 1.5 PSF <br /> 3/4" PLYWOOD =2.5 PSF <br /> 2xl0 JOISTS @ 16"OC= 3.0 PSF <br /> (2) LAYERS 5/8" GYPSUM BOARD = 5.5 PSF <br /> VINYL SOFFIT PANELS = 1.5 PSF <br /> MISCELLANEOUS= 1.0 <br /> DESIGN LOADING: <br /> LIVE LOADS =60 PSF <br /> SNOW LOADS =25 PSF <br /> DEAD LOADS = 15 PSF <br />