My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10101 7TH AVE SE BLDG 3 2025-12-12
>
Address Records
>
7TH AVE SE
>
10101
>
10101 7TH AVE SE BLDG 3 2025-12-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2025 11:47:29 AM
Creation date
10/21/2025 8:43:13 AM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
10101
Unit
BLDG 3
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Simpson - ... Construction Connectors • <br /> I <br /> LUS/HUS/HHUS/HGUS <br /> Double-Shear Face-Mount Joist Hangers <br /> ORAO <br /> ` This product is preferable to similar <br /> Z� installation,connectors because of(a)easier 1 for a <br /> w1/,e'for nd 4Xs <br /> (b)higher loads,(c)lower installed cost,or <br /> a combination of these features. <br /> C6 • L u <br /> All hangers in this series have double-shear nailing. a ° o <br /> = This innovation distributes the load through two ° ° <br /> points on each joist nail for greater strength.It also O a a <br /> allows the use of fewer nails,faster installation d H •• ° e <br /> and the use of standard nails for all connections. C <br /> (Do not bend or remove tabs.) c a • c <br /> 3 ° <br /> N Material:See tables,pp. 104-114 ° <br /> Finish:Galvanized.Some products available in c <; " �i CP <br /> O stainless steel or ZMAX°coating;see Corrosion <br /> Information, pp.12-15. <br /> t*or 2k <br /> Installation: ��LUS28 HUS210 HUS412 °`4xs <br /> • Use all specified fasteners;see General Notes. (HUS26 and <br /> • Nails must be driven at an angle through the joist HUS28 similar) <br /> or truss into the header to achieve the table loads. <br /> • Not designed for welded or nailer applications. ff 2 2 5/8� <br /> • Vviin 3x carrying memoers:when 0.162"x 3Lz" e — e ° <br /> nails are specified,use 0,162"x 21/"nails into <br /> the header and 0.162"x 3'/2"nails into the joist o •° ° c `� ° <br /> with no load reduction.When 0.148"x 3"nails <br /> are specified:use 0.148"x 21/2"nails into the <br /> header and 0.148"x 3"nails into the joist with <br /> no load reduction. e m s all <br /> ° 6 <br /> • With 2x carrying members:when 0.162"x 31/2' <br /> nails are specified,use 0.148"x 11/2"nails o < '4 <br /> into the header and 0.148"x 3"nails into the • ®`� <br /> joist and reduce the load to 0.64 of the table /� 8 <br /> values.When 0.148"x 3"nails are specified, <br /> use 0.148"x 1'h"nails into the header and <br /> 0.148"x 3"nails into the joist and reduce the HHUS410 HGUS3.25/12 z <br /> load to 0.77 of the table values.See p.22 for <br /> specific Load Adjustment Factors. o <br /> Allowable Loads: w <br /> Fi <br /> • See table on pp. 104-114 for loads. 0 <br /> 0 <br /> Options: <br /> z <br /> • LUS/HUS hangers cannot be modified. 0 <br /> • See next page for HHUS/HGUS modifications. <br /> N <br /> I?o <br /> N <br /> N <br /> O <br /> ° <br /> Double-Shear Nailing 0 <br /> Typical LUS28 Installation <br /> use 0.148"x 3"nail or <br /> o Double-Shear 0.148"x 31/4"nail <br /> Double- Nailing Dome Double Shear <br /> Shear Side View— Nailing Side View <br /> Nailing Do not CC (Available on <br /> Top View bend tab some models) <br /> 102 <br />
The URL can be used to link to this page
Your browser does not support the video tag.