Laserfiche WebLink
Simpson Strong-Tie� Wood Construction Connectors <br /> LUC/LU/U/HU/HUC <br /> Standard Face-Mount Joist Hangers <br /> LUC—Concealed-flange hanger available for 2x6,2x8, <br /> 2x10 and 2x12 lumber.Ideal for end of ledger/header <br /> or post conditions,the LUCZ also provides cleaner <br /> i lines for exposed conditions such as overhead decks. • ° <br /> C LU —Value engineered for strength and economy. <br /> Precision-formed — engineered for installation ease ° <br /> = and design value. <br /> U —The standard U hanger provides flexibility of • ° <br /> joist to header installation.Versatile fastener selection C with tested allowable loads. <br /> MHU/HUC— Most models have triangle and round ° <br /> U) holes.To achieve maximum loads,fill both round j `� 4 �� <br /> 72 and triangle holes with common nails.These y \ ��'for <br /> 0 heavy-duty connectors are designed for additional LU28 UZgi \� <br /> 14 <br /> strength,longevity and safety factors. (except LU roughs) U210 HU Projection seat <br /> on most <br /> Material:See tables on pp. 104-114 models for maximum bearing <br /> Finish:Galvanized.Some products available and section economy. <br /> in ZMAX coating or stainless steel. <br /> 0 0 <br /> Installation: <br /> • <br /> • <br /> • Use all specified fasteners;see General Notes. o o• <br /> • HU/HUC— Can be installed filling round holesModel configurations <br /> only,or filling round and triangle holes for ° ° may differ from those <br /> maximum values. • ° <br /> shown.Some HU <br /> • Joists sloped up to 1/4:12 achieve table loads. ° ° ;° models do not have <br /> • For installations to masonry or concrete ° triangle holes. <br /> 0 o Contact Simpson <br /> see pp.243-245. . ' Strong-Tie. <br /> • HU/HUC hangers can be welded to a steel ° <br /> member.Allowable loads are the lesser of the <br /> values in the hanger tables on pp. 104-114 or <br /> the weld capacity—refer to technical bulletin <br /> T-C-HUHUC-W at strongtie.com. LUC210Z HUC412 <br /> (LUC26Z similar) Concealed flanges <br /> • When nailing into s0iid sas;: carrying member's <br /> U <br /> end grain,the allowable load is adjusted by a ? <br /> factor of 0.67. <br /> Allowable Loads: <br /> HU min.nailing— <br /> • See table on pp. 104-114 for loads. ° fill round holes F <br /> HU max.nailing— z <br /> Options: fill round and ° o <br /> • For both flanges concealed,order HUC. triangle holes ° m co <br /> z <br /> • When the HUC is skewed,the header flange ° <br /> opposite the skew direction is not concealed. ° a <br /> See p.101. <br /> N <br /> O <br /> • For low-cost,code approved 45°skewed <br /> hangers,see SUR/SUL. HU68 Typical LUCZ Installation o <br /> • For field-adjustable hangers,see LSSJ, LRUZ o <br /> and LSSR on pp.117-119. <br /> • See modifications table for available options <br /> and associated load capacities for U and <br /> HU hangers. <br /> • For ease of ordering,refer to technical bulletin <br /> T-GU-HU-WS at strongtie.com. A <br /> • LU/LUC cannot be modified. <br /> Typical HU Installation Typical LU28 Installation <br /> 100 <br />