Laserfiche WebLink
Simpson Strong-Tie� Wood Construction Connectors <br /> LUC/LU/U/HU/HUC <br /> Standard Face-Mount Joist Hangers <br /> LUC—Concealed-flange hanger available for 2x6,2x8, <br /> 2x10 and 2x12 lumber.Ideal for end of ledger/header • ° �'k <br /> or post conditions,the LUCZ also provides cleaner <br /> i lines for exposed conditions such as overhead decks. ° <br /> 0 LU—Value engineered for strength and economy. • ' ° ° ° <br /> Precision-formed — engineered for installation ease • <br /> • <br /> = and design value. • <br /> U —The standard U hanger provides flexibility of <br /> joist to header installation.Versatile fastener selection <br /> ° <br /> C with tested allowable loads. <br /> cc HU/HUC—Most models have triangle and round <br /> holes.To achieve maximum loads,fill both round <br /> and triangle holes with common nails.These / lorU24I <br /> Nheavy-duty connectors are designed for additional LU28 HU214 <br /> strength,longevity and safety factors. (except LU roughs) U210 <br /> Projection seat on most <br /> Material:See tables on pp.104-114 models for maximum bearing <br /> Finish:Galvanized.Some products available and section economy. <br /> in ZMAX®coating or stainless steel. <br /> 0 0 <br /> Installation: •° <br /> s <br /> • Use all specified fasteners;see General Notes. 0 a • <br /> • HU/HUC—Can be installed filling round holes 0 • ° ° Model configurations <br /> only,or filling round and triangle holes for ° ° may differ from those <br /> maximum values. • ° shown.Some HU <br /> • Joists sloped up to Y4:12 achieve table loads. o ° • models do not have <br /> triangle holes. <br /> • For installations to masonry or concrete 0 0 ° a° • <br /> Contact Simpson <br /> see pp.243-245. • • ° <br /> Strong-Tie. <br /> • HU/HUC hangers can be welded to a steel <br /> member.Allowable loads are the lesser of the <br /> values in the hanger tables on pp.104-114 or <br /> the weld capacity—refer to technical bulletin <br /> T-C-HUHUC-W at strongtie.com. LUC210Z HUC412 <br /> (LUC26Zsimilar) Concealed flanges <br /> • When nailing into solid sawn carrying member's <br /> end grain,the allowable load is adjusted by a o <br /> z <br /> factor of 0.67. <br /> Allowable Loads: o <br /> HU min.nailing— S <br /> • See table on pp.104-114 for loads. fill round holes <br /> HU max.nailing— ° <br /> Options: fill round and ° a o <br /> 0 <br /> • For both flanges concealed,order HUC. triangle holes ° <br /> Z <br /> • When the HUC is skewed,the header flange ® ° a <br /> opposite the skew direction is not concealed. <br /> a � <br /> See p.101. c <br /> N <br /> • For low-cost,code approved 45°skewed <br /> hangers,see SUR/SUL. HU68 Typical LUCZ Installation N <br /> • For field-adjustable hangers,see LSSJ,LRUZ ° <br /> U <br /> and LSSR on pp.117-119. <br /> • See modifications table for available options <br /> and associated load capacities for U and <br /> HU hangers. <br /> • For ease of ordering,refer to technical bulletin <br /> T-C-U-HU-WS at strongtie.com. 0 0 <br /> • LU/LUC cannot be modified. a 0 <br /> 0 <br /> 0 <br /> 0 <br /> Typical HU Installation Typical LU28 Installation <br /> 100 <br />