Laserfiche WebLink
illLunc acH.NNlv'Val 3rjuu-c (rLJ C 1_ZtVV111 'ZiIAl_k; ONLY) PERMIT# <br /> BUILDING "' ANNING 6- <br /> Intake OK by: Date: Intake OK by: Assign To: Date: <br /> Intake Comments: Intake Comments: <br /> Zone <br /> Overlay/Agreement <br /> Route to Commercial Building Nonresidential Use <br /> ❑ Route to Residential Building Residential Use <br /> ❑ Make this a"W"Permit Proposed No.of Dwelling Units: <br /> BIdgfTl1Addn1Rem Size :y }f Total No.of Dwelling Units: <br /> Garage/Accessory Struct.Size Planning/Landscape Inspection Required before Final? ❑Yes ❑No <br /> Number of Stories `?11 "In Lieu"Fee:Type: Amount$ <br /> Basement QNo [Yes, Fin/Unfin School Impact Fee: Total $ <br /> Type of Construction \/4k Calculated: Credit: <br /> Occupancy Group f ❑Everett School Dist ❑Mukiiteo School Dist <br /> Occupancy Load Park Impact Fees for permits applied for after 11112022: <br /> Fire Sprinklers:ElUpdate Existing❑New System ❑Not Req'd Park Impact Fee Total$ i (net due after credit for existing uses) <br /> Reason Sprinklers Required: Fee Schedule Used For Calculation(Year): <br /> j-( ------------------ ------------------------- ------------------------ <br /> - <br /> Fire Alarm: Update Existing ❑New System LINot Req'd Permit Technician- - <br /> Use Only:Apply Phase-In Credit Per EMC19.53.200-------- <br /> Reason Fire Alarm Required: ER Yes <br /> Credit-Issued 1/1/2022-9/2/2022 <br /> ER <br /> RCW 64.55 MF worksheet req'd for permit? Y es ❑ No ❑ 50%Credit-Issued 013/2022-6/2/2023 <br /> Add'1 RCW 64.55 docs required priorto final? DYes XINo ❑ 0%Credit-Issued 6/3/2023 or later <br /> VALUATION CALCULATION: Total$ 2 Additional Notes- <br /> Approved By: Date. <br /> PUBLIC WORKS <br /> Additional Notes: D-<—vr- Intake OK by: Date: <br /> .------------------------;;--------------- <br /> Intake Comments: ;PW Warksheet Meeded if, <br /> E1Sys Dev EvaI(MISM QTraffic Mit Eval <br /> Approved By: Date: < <> %' = 'ElSite Work/Drainage ElAddress Letter <br /> -E113ackflow Prevention for high hazard: <br /> (dental,medical,animals,mortuary,hospital, <br /> FIRE 1]EPARTMENT ;supportive housing) <br /> Separate I Deferred Submittals Required: ❑Route this folder for PW Review at end --PWReview Worksheets ^�- <br /> ❑Fire Sprinklers ❑Fire Alarm DOther: LIThis project also has a separate concurrent PW Review(Green Folder) <br /> Additional Notes: AND LlCreate Green Folder [ Submitted Previously ❑Deferred <br /> ❑This Permit is Approved by Public Works <br /> Fire Dept Fees: ❑See PW Review Worksheet and associated attached items <br /> rl Review of As-Built Plans-NO FIRE FEE ❑A Separate PW Permit is Required(Permit#. PW ) <br /> ❑Minimal or No Fire Scope-NO FIRE FEE AND ❑ Is located in this folder <br /> ❑ Review/Inspection Scope-ADD FIRE FEE ❑ Is in a Separate Green Folder Qoinwith this folder for permit issuance) <br /> Approved By: Date: ❑Will be issued separately(Separate Green Folder,PW issued ahead of Bldg) <br /> Public Works has no scope—PW Not Required <br /> ELEMICALJP_LUMBING Additional Notes: <br /> Additional Notes: <br /> Approved By: Date: Completed)3y: Date: <br />