Laserfiche WebLink
Y <br /> DIBBLE ENGINEERS INC <br /> STRUCTURAL CALCULATIONS <br /> TABLE OF CONTENTS <br /> v p�iilr.s[e Eo Jn��Eii��; � — ���� ���Cit�, DID] Job 23 <br /> 'Fl 0{ <br /> The existing decks are planned to be renovated with a new topical membrane and soffit.While the framing <br /> is exposed,the contractor will evaluate and repair damaged members.The renovation includes the <br /> replacement of all existing box columns with new timber columns. <br /> Design Criteria and Loads <br /> Gravity <br /> Lateral <br />