My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4520 S 3RD AVE 2025-12-12
>
Address Records
>
S 3RD AVE
>
4520
>
4520 S 3RD AVE 2025-12-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2025 11:26:16 AM
Creation date
10/21/2025 2:55:39 PM
Metadata
Fields
Template:
Address Document
Street Name
S 3RD AVE
Street Number
4520
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number' E2108-048 Description:4 altered circuits <br /> Applied:8/6/2021 Approved:3/1/2022 Site Address:4520 S 3RD AVE <br /> Issued:3/1/2022 Finaled:9/9/2022 City,State Zip Code: EVERETT,WA 98203-2512 <br /> Status: FINALED Applicant: BOSCH ELECTRIC INC <br /> Parent Permit: B2109-021 Owner: MINTA BUSE <br /> Parent Project: Contractor: BOSCH ELECTRIC INC <br /> Details: <br /> range downdraft,weatherproof front/back exterior <br /> 4 altered circuits <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 3/16/2022 3/16/2022 ELEC 06-ROUGH IN STEVE BANKS NOT READY eTRAKiT Inspection Request <br /> Notes: <br /> 3/15/2022 8:20 AM BOSCH ELECTRIC INC <br /> Call electrician in advance to meet for access. Steve 425.870.7421 <br /> Contact Name:BOSCH ELECTRIC INC <br /> Site Address:4520 S 3RD AVE <br /> Phone:4253978765 <br /> e-Mail:BOSCHELECTRICINC@OUTLOOK.COM <br /> (3/16/2022 2:18 PM SKB) <br /> Discussed methods of exposing work for inspection etc. <br /> 4/4/2022 4/4/2022 VIOLATION-HOLD CINDY BERGSMA OTHER <br /> Notes: <br /> 4520 S 3rd Ave is to be put on violation hold as drywall has not been opened sufficient to perform inspections.Told her that next inspection needs to <br /> be SRC.This was per Steve as well. <br /> 6/7/2022 6/7/2022 ELEC-SITE STEVE BANKS NOT READY <br /> READINESS CHECK <br /> Notes: <br /> MINTA@SEATTLEEYFC.ORG <br /> 6/7/2022 6/7/2022 ELEC06-ROUGH IN STEVE BANKS CORRECTION <br /> REQUIRED <br /> Notes: <br /> Raise the junction boxes in the attic.Provide AFCI protection for all altered circuits and or receptacles that have been changed,including kitchen, <br /> laundry,etc.add a switch at the crawl space entry and a receptacle for the new furnace in the crawl space. <br /> I <br /> Printed:Tuesday,21 October, 2025 1 of 2 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.