My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Washington State Department of Transportation 10/20/2025
>
Contracts
>
Agreement
>
Grant Agreement (City as Grantee)
>
Washington State Department of Transportation 10/20/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2025 9:59:59 AM
Creation date
10/22/2025 9:59:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Washington State Department of Transportation
Approval Date
10/20/2025
Council Approval Date
10/15/2025
End Date
6/30/2029
Department
Transit
Department Project Manager
Amanda Koerber
Subject / Project Title
2025-2029 Green Transportation Grant – Everett Transit Maintenance Facility Engineering
Tracking Number
0004990
Total Compensation
$2,325,000.00
Contract Type
Agreement
Contract Subtype
Grant Agreement (City as Grantee)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
(PS&E). After the DBE goals are determined, the applicable WSDOT General Special <br />Provision (GSP), for the type of goal set, shall be included in the Plans, Specifications and <br />Estimate (PS&E). The GRANTEE shall coordinate with WSDOT for collecting the current <br />version of both GSPs. <br />D.If the GRANTEE receives federal funds through WSDOT Public Transportation Division for <br />this project, the GRANTEE shall coordinate with WSDOT and provide requested <br />documentation for written approval prior to initiating any of the following classifications of <br />work on this project after agreement execution, as applicable. <br />1.Preliminary engineering. <br />2.Right of way acquisition. <br />3.Final Design. <br />4.Construction. <br />E.If the project was initiated prior to agreement execution and the GRANTEE is seeking <br />reimbursement for all or some of those activities up to pre-award authorization date, the <br />GRANTEE shall submit requested documents to WSDOT to confirm federal aid <br />requirements. <br />Section 19 <br />No Obligations by the State Government <br />No contract between the GRANTEE and any contractor or subcontractor shall create any <br />obligation or liability of WSDOT with regard to this AGREEMENT without WSDOT’s <br />specific written consent, regardless of WSDOT’s concurrence in, or approval of, the award <br />of any contract or subcontract or the solicitations thereof. The GRANTEE hereby agrees <br />to include this provision in all contracts it enters into for the design, acquisition, and <br />construction of facilities and/or infrastructure related to the Project, or the performance of <br />any work to be accomplished under this AGREEMENT. <br />Section 20 <br />Ethics <br />A.Relationships with Employees and Officers of WSDOT. The GRANTEE shall not <br />extend any loan, gratuity, or gift of money in any form whatsoever to any employee or <br />officer of WSDOT, nor shall the GRANTEE knowingly rent or purchase any Project <br />equipment and materials from any employee or officer of WSDOT. <br />B.Employment of Former WSDOT Employees. The GRANTEE hereby warrants that it <br />shall not employ on a full, part-time, or another basis during the period of this <br />AGREEMENT, any professional or technical personnel who are or have been, at any time <br />during the period of this AGREEMENT, in the employ of WSDOT without the written <br />consent of WSDOT. <br />Everett Transit <br />PTD1163 <br />11 of 25
The URL can be used to link to this page
Your browser does not support the video tag.