My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10524 HOLLY DR 2025-11-03
>
Address Records
>
HOLLY DR
>
10524
>
10524 HOLLY DR 2025-11-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2025 11:48:50 AM
Creation date
10/22/2025 11:48:50 AM
Metadata
Fields
Template:
Address Document
Street Name
HOLLY DR
Street Number
10524
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U �4 D( � oo <br /> PUBLIC WORKS DEPARTMENT <br /> Utilities Division,3200 Cedar Street <br /> Everett WA 98201 <br /> E V E R E T T 425-257-8800 <br /> WASHINGTON <br /> Receipt # Date Paid 01(to I aQpZ� <br /> Cost of Work Order Work Order# <br /> X Cost of Service Order $7700.00 Service Order# <br /> Requested By: Thad Newport <br /> Contact Person Christopher Kiel Telephone# 425 923-5414 <br /> Email Address: chriskiphomes@gmail.com Date of Request 1-5-2024 <br /> Property Owner(name) Brookside Estates NW LLC <br /> Charge Cost to(name if different than owner) Attn: Christopher <br /> Address 10511TH Ave SE Suite C City Everett, WA zip 98208 <br /> Installation Location 10524 Holly Dr(aka 1602 106t" PI SW) <br /> Installation type/description/size/etc. 8" tap and 8" connection. 8" tap on existing 8" main and <br /> connect to contractor installed 8" main after purity. Contractor to excavate, shore, restore and <br /> provide traffic control. <br /> ❑ The following estimate is based upon the Utilities Division providing all labor,equipment, <br /> materials,restoration,and final hook-up. <br /> Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br /> date to allow for scheduling and parts procurement <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor,material,equipment rental and <br /> administrative costs, the deficit shall be charged to the property for which such installation was made and the <br /> owner thereof, and provided further, that any excess payment shall be returned to the person applying for the <br /> installation. <br /> *Signed Cost Estimate sheet must be sent to PermitSel^vices@EverettWA.gov to move forward. <br /> *Permit must be paid prior to ordering parts or scheduling work. <br /> *Must have valid Public Works Permit before work can be performed. <br /> WATER METERS 4"AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> TOTAL: $7700.00 <br /> cc: PerillitServices©EverettWA.gov,Shaun Bridge-EmaiI,Jim Spooner-HC,Sabrina Good-Email, <br /> Grant Moen-Email,Terri Jorgenson-Email,Thad Newport-Email,Lindsay Moo-Email,Jim Knappert-Email <br /> Prepared by: Jim Spooner Date Estimate Prepared 1-9-2024 <br /> Accepted by: Christopher Kiel (J4- Representing Brookside Estates NW LLC <br /> ESTIMATE GOOD FOR G MONTHS <br /> S:WConunonlclericfdlCost.est\Nov2023U0524 Holly-R inch CEFP <br /> 1of1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.