My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5109 SEAHURST AVE 2025-12-12
>
Address Records
>
SEAHURST AVE
>
5109
>
5109 SEAHURST AVE 2025-12-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2025 10:42:17 AM
Creation date
10/22/2025 2:39:30 PM
Metadata
Fields
Template:
Address Document
Street Name
SEAHURST AVE
Street Number
5109
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> EVERETT Permit Services <br /> WASHINGTON <br /> MEMORANDUM <br /> TO: Jonathan Shelton I Oak Bay Development LLC, 206-729-6323 <br /> CC: Brian Kalab I Insight Engineering Co.,425-303-9363 <br /> FROM: Thad Newport I City of Everett Engineering/Permit Services,425-257-8814 <br /> DATE: 06/13/2019 <br /> SUBJECT: Plan Review Comments for Public Works Permit Application <br /> PROPOSAL: Site work for two lot short plat <br /> LOCATION: 5109 Seahurst Avenue <br /> PERMIT#: PW1905-036 <br /> A review of this project by the Engineering/Permit Services Division indicates that the following revisions <br /> should be made and/or the following conditions must be met: <br /> Please see the compiled list of comments below and the attached redlines to revise your plans accordingly, <br /> prior to resubmitting to the Permit Services Counter. If you have any questions regarding the <br /> comments/redlines or need anything further, please directly contact this project's Public Works plans <br /> reviewer,Thad Newport, at TNewport@everettwa.gov (or 425-257-8814), or the other reviewers listed <br /> depending on the scope of the question. Please note that these comments are compiled from Public Works <br /> reviewers for the Public Works (civil) plans only. The applicant team may receive a separate comment letter <br /> from the Building Reviewer and/or the Planning Reviewer for architectural, landscape, or other types of <br /> drawings. <br /> 1. Please resubmit the following items to the Permit Services Counter with your resubmittal once all <br /> requested revisions have been made: <br /> a. Transmittal Sheet: (1) available at the Permit Counter (and included herein for your use upon <br /> resubmittal). <br /> b. Plans: (4)full size sets of revised plans, plus original City Markups. <br /> c. Drainage Report/SWPPP: (2) copies of revised report. <br /> d. Cost Estimate for Permit Fee Calculation Form: (1) copy of cost estimate form filled out for the <br /> City to use to calculate the Public Works Permit Fee (as applicable based on water plan revision). <br /> The Permit Counter is open Monday through Friday from 7:30am-12:00pm and from 1:00pm-4:00pm (closed <br /> between 12:00pm-1:00pm for lunch). <br /> 2. Please see all redlines on the attached plans for required corrections in addition to all comments listed <br /> below. Frequently, redlines will be stand-alone and will not have an associated item in this corrections <br /> letter. Likewise, comments below may not have associated redlines. Please indicate to the City that all <br /> redlines have been adequately addressed by providing checkmarks or notes next to the City's redlines to <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.