Laserfiche WebLink
��n n(� 41 <br /> ) <br /> Q0 non <br /> SEP 3 0 2019 c <br /> a o, <br /> CITY OF EVERETT L aCL <br /> )INSIGHT ENGINEERING CO. Permit <br /> _sup r � n�n <br /> o <br /> Z S <br /> I I- <br /> STORMWATER SITE PLAN Q a <br /> z w <br /> m 0 - <br /> For = W <br /> Oak Bay Everett SP C" ° M z <br /> 3LnV �� <br /> Ln <br /> Prepared for 1 ',n, .Q v <br /> City of Everett ' a ro o Q v <br /> 2930 Wetmore Ave a V) o Q fa-- o <br /> Everett,WA-98201 <br /> 425.257.8700 <br /> Applicant/Owner: Contact: <br /> Oak Bay Development, LLC Brian R. Kalab, P.E. <br /> P. 0. Box 12621 P.O. Box- 1478 <br /> Everett, WA 98206 Everett, WA-98206 <br /> 425.303.9363 <br /> Project Site Location: <br /> 5109 Seahurst Ave <br /> Everett, WA 98203 <br /> IECO Project: 18-0937 <br /> Certified Erosion and Sedimentation Control Lead: <br /> Brian R. Kalab, P.E. <br /> Stormwater Site Plan Prepared By: <br /> Jacob D. Mealey, P. E. <br /> R, <br /> Stormwater Site Plan Preparation Date: Q` or w�•tiiky <br /> July 24, 2019 �cti iti <br /> Approximate Construction Date: H <br /> May 1, 2020 l�o�ti <br /> Q, t <br /> Is <br /> I <br /> P.O Box 1478 Everett,WA 98206 P:425.303.9363 08/08/2019 <br /> F:425.303.9362 • info@insightengineering.net <br />