My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5109 SEAHURST AVE 2025-12-12
>
Address Records
>
SEAHURST AVE
>
5109
>
5109 SEAHURST AVE 2025-12-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2025 10:42:17 AM
Creation date
10/22/2025 2:39:30 PM
Metadata
Fields
Template:
Address Document
Street Name
SEAHURST AVE
Street Number
5109
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
temporary BMPs are no longer needed. Trapped sediment shall be removed or stabilized <br /> on site. Disturbed soil resulting from removal of BMPs or vegetation shall be permanently <br /> stabilized. <br /> Element #12--Manage the Proiect <br /> Erosion and sediment control BMPs for this project have been designed based on the <br /> following principles: <br /> Design the project to fit the existing topography, soils, and drainage patterns; Emphasize <br /> erosion control rather than sediment control; Minimize the extent and duration of the area <br /> exposed; Keep runoff velocities low; Retain sediment on site; Thoroughly monitor site and <br /> maintain all ESC measures and Schedule major earthwork during the dry season. The <br /> SWPPP shall be modified as necessary to include additional or modified BMPs designed to <br /> correct problems identified. Revisions to the SWPPP shall be completed within seven (7) <br /> days following the inspection. <br /> Element#13—Protect On-site Stormwater Management BMPs for Runoff from Roofs <br /> and Other Hard Surfaces <br /> NA <br /> Insight Engineering Co.- Stormwater Site Plan 07/24/19 <br /> - 16- <br />
The URL can be used to link to this page
Your browser does not support the video tag.