My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5109 SEAHURST AVE 2025-12-12
>
Address Records
>
SEAHURST AVE
>
5109
>
5109 SEAHURST AVE 2025-12-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2025 10:42:17 AM
Creation date
10/22/2025 2:39:30 PM
Metadata
Fields
Template:
Address Document
Street Name
SEAHURST AVE
Street Number
5109
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L�2COBALT <br /> GEOTECHNICAL INVESTIGATION G E O S C I E N C E S <br /> EVERETT, WASHINGTON <br /> November 16,2018 <br /> Temporary cuts should be in accordance with the Washington Administrative Code (WAC) Part N, <br /> Excavation,Trenching,and Shoring. Temporary slopes should be visually inspected daily by a qualified <br /> person during construction activities and the inspections should be documented in daily reports. The <br /> contractor is responsible for maintaining the stability of the temporary cut slopes and reducing slope <br /> erosion during construction. <br /> Temporary cut slopes should be covered with visqueen to help reduce erosion during wet weather,and the <br /> slopes should be closely monitored until the permanent retaining systems or slope configurations are <br /> complete. Materials should not be stored or equipment operated within to feet of the top of any <br /> temporary cut slope. <br /> Soil conditions may not be completely known from the geotechnical investigation. In the case of <br /> temporary cuts, the existing soil conditions may not be completely revealed until the excavation work <br /> exposes the soil. Typically, as excavation work progresses the maximum inclination of temporary slopes <br /> will need to be re-evaluated by the geotechnical engineer so that supplemental recommendations can be <br /> made. Soil and groundwater conditions can be highly variable. Scheduling for soil work will need to be <br /> adjustable,to deal with unanticipated conditions,so that the project can proceed and required deadlines <br /> can be met. <br /> If any variations or undesirable conditions are encountered during construction,we should be notified so <br /> that supplemental recommendations can be made. If room constraints or groundwater conditions do not <br /> permit temporary slopes to be cut to the maximum angles allowed by the WAC, temporary shoring <br /> systems may be required. The contractor should be responsible for developing temporary shoring <br /> systems, if needed. We recommend that Cobalt Geosciences and the project structural engineer review <br /> temporary shoring designs prior to installation,to verify the suitability of the proposed systems. <br /> 8.1.3 Erosion and Sediment Control <br /> Erosion and sediment control(ESC)is used to reduce the transportation of eroded sediment to wetlands, <br /> streams, lakes, drainage systems, and adjacent properties. Erosion and sediment control measures <br /> should be implemented and these measures should be in general accordance with local regulations. At a <br /> minimum, the following basic recommendations should be incorporated into the design of the erosion <br /> and sediment control features for the site: <br /> • Schedule the soil, foundation, utility, and other work requiring excavation or the disturbance of the <br /> site soils,to take place during the dry season(generally May through September). However,provided <br /> precautions are taken using Best Management Practices(BMP's),grading activities can be completed <br /> during the wet season(generally October through April). <br /> • All site work should be completed and stabilized as quickly as possible. <br /> • Additional perimeter erosion and sediment control features may be required to reduce the possibility <br /> of sediment entering the surface water. This may include additional silt fences, silt fences with a <br /> higher Apparent Opening Size(AOS),construction of a berm,or other filtration systems. <br /> • Any runoff generated by dewatering discharge should be treated through construction of a sediment <br /> trap if there is sufficient space. If space is limited other filtration methods will need to be <br /> incorporated. <br /> 5 <br /> PO Box 82243 <br /> Kenmore,WA 98028 <br /> cobaltgeopgmail.com <br /> 2o6-331-1097 <br />
The URL can be used to link to this page
Your browser does not support the video tag.