Laserfiche WebLink
meanders north for about 1,750-ft and the flow then enters the existing cross culvert to go <br /> across Glenhaven Dr and W Mukilteo Blvd. This creek meanders north for about 2,000-ft <br /> and finally drains into Pudget Sound. This is where the drainage analysis was completed. <br /> There did not appear to be any restrictions or erosion problems within I mile of the site. <br /> In the mitigated state the runoff from the site will flow the west to the existing <br /> drainage system along the Seahurst Ave. The flow is minimal and therefore the <br /> downstream channel should not experience any problems in the future. <br /> Insight Engineering Co. -Stormwater Site Plan 07/24/19 <br /> -21 - <br />