My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1617 OAKES AVE 2025-12-12
>
Address Records
>
OAKES AVE
>
1617
>
1617 OAKES AVE 2025-12-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2025 10:30:20 AM
Creation date
10/23/2025 8:22:59 AM
Metadata
Fields
Template:
Address Document
Street Name
OAKES AVE
Street Number
1617
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: B2205-005 Description: NEW 20'X36'WOOD FRAME GARAGE <br /> Applied:5/3/2022 Approved:7/15/2022 Site Address: 1617 OAKES AVE <br /> Issued:7/22/2022 Finaled: City,State Zip Code: EVERETT,WA 98201 <br /> Status: PERMIT ISSUED Applicant: DAVID PEDERSEN <br /> Parent Permit: PW2207-009 Owner: DIEFENDORF JOCELYN&BOWEN TYLER <br /> Parent Project: Contractor: OWNER <br /> Details: <br /> SCOPE UPDATE 10/14/22: ADDITIONAL CONCRETE DRIVEWAY <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> BLDG 7-EXTERIOR BLDG INSPECTOR eTRAKiT Inspection Request <br /> 0 <br /> 7SHEAR <br /> Notes: <br /> 7/27/2023 8:52 AM Tyler Bowen <br /> Contact Name:Tyler Bowen <br /> Site Address:1617 OAKES AVE <br /> Phone:4252322773 <br /> e-Mail:flyfast2u@aol.com <br /> BLDG 16-FINAL BLDG INSPECTOR eTRAKiT Inspection Request <br /> Notes: <br /> 7/8/2024 4:13 PM Tyler Bowen <br /> Final inspection <br /> Contact Name:Tyler Bowen <br /> Site Address:1617 OAKES AVE <br /> Phone:4252322773 <br /> e-Mail:flyfast2u@aol.com <br /> 8/3/2022 8/3/2022 BLDG 02- RAKEEB KHAN PARTIAL See Notes <br /> FOOTING/SETBACK APPROVAL <br /> Notes: <br /> Garage foundation is OK. No holdowns installed. Contractor stated holdowns to be installed on day of pour. Verify holdowns during shear or framing <br /> inspection. Footings outside garage not ready(stairs and retaining wall) <br /> (8/3/2022 1:23 PM RFK) <br /> Garage foundation is OK. No holdowns installed. Contractor stated holdowns to be installed on day of pour. Verify holdowns during shear or framing <br /> inspection. Footings outside garage not ready(stairs and retaining wall) <br /> 8/3/2022 8/3/2022 BLDG 03- RAKEEB KHAN APPROVAL <br /> FOUNDATION WALL <br /> Notes: <br /> I <br /> Printed:Wednesday, 10 July, 2024 1 of 4 <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.