Laserfiche WebLink
2022 Stormwater System Development Fee Calculations <br /> Permit M B2205-005 Additional Notes: <br /> Project Address: 1617 Oakes Stormwater system development fees split on two separate permits:ground hard surfaces <br /> Project Name: Garage and Driveway calculated on Public Works Permit and roof hard surfaces calculated on Building Permit. <br /> Answer the Following Questions(Required):All Yellow Inputs <br /> Water District: Everett <br /> Sewer District: Everett Prepared By: Tawnya Herman Date: 7/13/2022 <br /> Outside City Limits? No *Adds a 25%Surcharge <br /> Supportive Housing Credit? No *Reduces by 80% Reviewed By: Thad Newport Date: 7/13/2022 <br /> Fee Calculations: <br /> Stormwater System Development Fees: <br /> Permit#: B2205-005 Type of Construction: Existing Development Adding New+Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: 720 ISF <br /> Stormwater System Dev Fee: $192.82 Add this fee to the Building Permit forraof area hard surfaces. <br /> Stormwater System Development Fees: <br /> Permit q: PW2207-009 Type of Construction:I Existing Development Adding New+Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard SUrfaces-1 480 ISF <br /> Stormwater System Dev Fee: $128.54 Add this fee to the Public Works Permit for hard surfaces on the ground. <br />