Laserfiche WebLink
Element 6. Protect slopes: <br /> ❑ BMP C 120:Temporary and Permanent Seeding <br /> ❑ BMP C 130: Surface Roughening <br /> ❑ BMP C 131: Gradient Terraces <br /> ❑ BMP C200:Interceptor Dike and Swale <br /> ❑ BMP C201: Grass-Lined Channels <br /> ❑ BMP C203:Water Bars <br /> ❑ BMP C204: Pipe Slope Drains <br /> ❑ BMP C205: Subsurface Drains <br /> ❑ BMP C206: Level Spreader <br /> ❑ BMP C207: CheckDams <br /> ❑ BMP C208:Triangular Silt Dike(Geotextile Encased Check Dam) <br /> ❑ OtherPertheSWMMWW: <br /> ® Not applicable to my proposed project <br /> Explain: <br /> Element 7. Protect drain inlets: <br /> ❑ BMP C220:Storm Drain Inlet Protection <br /> ❑ Other Per theSWMMWW: <br /> L Not applicable to my proposed project <br /> Explain: <br /> Element 8. Stabilize Channels and Outlets: <br /> ❑ BMP C202: Channel Lining <br /> ❑ BMP C 209:Outlet Protection <br /> ❑ Other Per theSWMMWW: <br /> 19 Not applicable to my proposed project <br /> Explain: <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 12 <br /> the Combined Sewer Area-April 2021 <br />