Laserfiche WebLink
Element 13. Protect low impact development: <br /> ❑ BMP C 102: BufferZones <br /> ❑ BMP C 103: High Visibility Plastic or Metal Fence <br /> ❑ BMP C200: Interceptor Dike and Swale <br /> ❑ BMP C207: CheckDams <br /> ❑ BMP C208:Triangular Silt Dike(Geotextile Encased Check Dam) <br /> ❑ BMP C231: Brush Barrier <br /> ❑ BMP C233 Silt Fence <br /> El BMP C 234:Vegetated Strip <br /> ❑ Other Perthe SWMMWW: <br /> IN Not applicable to my proposed project <br /> Explain: <br /> Task 3: Construction SWPPP drawings <br /> 19 Provide a Temporary Erosion and Sediment Control (TESC) plan for your project <br /> ® Show on yourTESC Plan all BMPs selected above to satisfy the 13 Elements on your <br /> TESC Plan. <br /> a See City of Everett Public Works Standard Plan 103-TESC Plan Example <br /> everettwa.gov/DocumentCenterNiew/7040 <br /> Note:Construction Storm wa terPollution Pre ven tion Plans(Constru ction SWPPPs)that <br /> involve engineering calculations must also be prepared by or under the direction of a <br /> Washington State licensed professional engineer. <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in ;4 <br /> the Combined Sewer Area-April 2021 <br />