My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
215 SHUKSAN WAY 2025-12-12
>
Address Records
>
SHUKSAN WAY
>
215
>
215 SHUKSAN WAY 2025-12-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2025 10:59:44 AM
Creation date
10/24/2025 8:24:00 AM
Metadata
Fields
Template:
Address Document
Street Name
SHUKSAN WAY
Street Number
215
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Dry Pipe Systems- In addition to the standard hydrostatic test, an air pressure ❑ ❑ ❑ <br /> leakage test at 40 psi shall be conducted for 24 hours.Any leakage that results in a <br /> loss of pressure in excess of 1% psi for the 24 hours shall be corrected.This test <br /> will have to be scheduled for a different day to allow for the 24 hours test. <br /> Additions or Modifications: <br /> PASS FAIL N/A <br /> 7. 20 or Fewer Heads-Additions or Modifications affecting 20 or fewer sprinklers ❑ ❑ ❑ <br /> shall not require testing in excess of system working pressure. <br /> 8. More Than 20 Heads-Additions or Modifications affecting more than 20 ❑ ❑ ❑ <br /> sprinklers,the new portions shall be isolated and tested at not less than 200 psi <br /> for 2 hours. (Additions or Modifications that cannot be isolated, such as relocated <br /> drops, shall not require testing in excess or system working pressure. <br /> 9. Work Affecting FDC- Repairs or replacements or work affecting the FDC, piping <br /> between the exterior and the check valve in the fire department inlet pipe shall be <br /> isolated and hydrostatically tested at 150 psi. <br /> Step 4: Sprinkler Final <br /> PASS FAIL N/A <br /> 1. Scheduling-The contractor shall schedule for the inspection using eTRAKiT online ❑ ❑ ❑ <br /> permitting portal. Inspection requests submitted online before 11:59 p.m. on <br /> Monday-Friday will be tentatively scheduled for the next business day. <br /> 2. Fire Alarm -Acceptance testing for the above ground portions of the sprinkler ❑ ❑ ❑ <br /> system will not be conducted unless the fire alarm system is fully operational and <br /> is ready for acceptance testing at the same time as the sprinkler system. All <br /> sprinkler devices shall be tested with both the sprinkler and fire alarm contractors <br /> present. <br /> 3. Approved Plans-Approved/Stamped set of plans. ❑ ❑ ❑ <br /> 4. Waterflow Test-Test waterflow alarm by flowing water from the Inspectors Test ❑ ❑ ❑ <br /> Valve.The alarm should sound no earlier than 20 seconds and no later than 90 <br /> seconds. (Wet and dry systems) <br /> 5. Access Panels-A minimum 12" x 36" access panels shall be provided for all valves ❑ ❑ ❑ <br /> located inside a wall or concealed space. Signage shall be provided on the outside <br /> of access panel indicating type of valve that is concealed within. <br /> 6. Exterior Horn/Strobe-Verify that a listed horn/strobe device is located on the ❑ ❑ ❑ <br /> front exterior of the building in an approved location in close proximity to the <br /> buildings address. Such device shall be activated by water flow actuation of the <br /> automatic sprinkler system. <br /> Fire Marshal's Office 425.257.8100 1 everettwa.gov/fire I INFORMATION HANDOUT C-6 4.13.2020 I Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.