My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
215 SHUKSAN WAY 2025-12-12
>
Address Records
>
SHUKSAN WAY
>
215
>
215 SHUKSAN WAY 2025-12-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2025 10:59:44 AM
Creation date
10/24/2025 8:24:00 AM
Metadata
Fields
Template:
Address Document
Street Name
SHUKSAN WAY
Street Number
215
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Backfill -The trench shall be backfilled between joints before testing to prevent El El El <br /> movement of pipe.Thrust blocks and or restrained joint systems shall also be left <br /> uncovered for inspection. <br /> 7. Joints-Joints shall be inspected for visual leakage El El El <br /> 8. Thrust Blocks-Thrust blocks shall be installed as per approved set of plans and El El El <br /> placed between undisturbed earth and the fitting to be restrained and shall be <br /> capable of resisting the calculated thrust forces. Wherever possible,thrust blocks <br /> shall be placed so that the joints are accessible for repair. <br /> 9. Release Pressure-After verifying that the system has maintained the required 200 El El El <br /> psi for 2 hours, release pressure from the system to verify that the gauge is <br /> operating properly. <br /> Flushing: <br /> PASS FAIL N/A <br /> 10. Before Connection- Underground piping,from the water supply to the system El El El <br /> riser, and lead-in connections to the system riser shall be completely flushed <br /> before the connection is made to downstream fire protection system piping. <br /> 11. Pre-Flushing- Pre-flushing shall be conducted by the contractor to ensure all El El El <br /> foreign materials have been flushed from the system prior to the fire inspector <br /> conducting the official flush test. <br /> 12. Flushing Operations- Flushing operations shall be set-up and conducted El El El <br /> complying with the following: <br /> • The discharge used for the flush shall be located in close proximity of the <br /> lead-in connection to the system riser. <br /> • Water shall be discharged through an open ended 4-inch pipe or through <br /> a 4-inch pipe connected to a Y or siamese connection with two 2% inch <br /> hoses. <br /> • There shall be two burlap bags connected to each outlet. <br /> • Flow rate shall be at a minimum of 390 gpm. <br /> • See the examples 1,2, and 3 of the acceptable configurations for flushing <br /> of the system <br /> 13. 10-Minute Cycles-The fire inspector will conduct the flush test in 10-minute El El El <br /> cycles, after each cycle the inspector will inspect the burlap bags located at the <br /> outlets for foreign materials.These cycles will continue until water is clear and the <br /> bags are free of all foreign materials. Note:After two cycles, if significant <br /> materials are still present in the bags the inspector will reschedule the remainder <br /> of the test for a different time to allow for the contractor to continue pre flushing <br /> the system. <br /> Fire Marshal's Office 425.257.8100 1 everettwa.gov/fire I INFORMATION HANDOUT C-6 4.13.2020 I Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.