My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
215 SHUKSAN WAY 2025-12-12
>
Address Records
>
SHUKSAN WAY
>
215
>
215 SHUKSAN WAY 2025-12-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2025 10:59:44 AM
Creation date
10/24/2025 8:24:00 AM
Metadata
Fields
Template:
Address Document
Street Name
SHUKSAN WAY
Street Number
215
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Example #3 <br /> 1 Water can be 1 <br /> 1 Remove clapper dur- discharged through 1 <br /> 1 ing flushing operation open end of 4 in. 1 <br /> 1 Install a plug or 4 in. (102 mm) pipe or 1 <br /> 1 a nipple and cap (102 mm) through Y or Siamese 1 <br /> 1 and flush pipe connection with hose 1 <br /> underground ° as shown above 1 <br /> 1 before overhead 1 <br /> 1 piping is `1 <br /> 1 connected Fire e <br /> department Grade 1 <br /> 1 check <br /> 1 Approved valve °,e From underground <br /> 1 indicating o 1 <br /> 1 valve 1 <br /> 1 1 <br /> 1 <br /> 1 <br /> Rough-In/Cover PASS FAIL N/A <br /> 1. Concealment- No drywall or other coverings shall be permitted to conceal any ❑ ❑ ❑ <br /> components of the fire sprinkler system until after the Rough-In/Cover Inspection <br /> has been completed and approved by the fire code official. <br /> 2. Scheduling-The contractor shall schedule for the inspection using eTRAKiT online ❑ ❑ ❑ <br /> permitting portal. Inspection requests submitted online before 11:59 p.m. on <br /> Monday-Friday will be tentatively scheduled for the next business day. <br /> 3. Approved Plans-Consult Approved/Stamped set of plans. ❑ ❑ ❑ <br /> 4. Size&Type of Piping-Verify proper type and size of piping. ❑ ❑ ❑ <br /> 5. Changes-Confirm the installation of the piping does not have excessive change of ❑ ❑ ❑ <br /> directions that are not indicated on approved plans. (Excessive use of extra <br /> fittings, such as elbows may affect hydraulic calculations). <br /> 6. Penetrations-All piping penetrations through fire rated assemblies have been ❑ ❑ ❑ <br /> properly sealed by an approved method. Fire-stopping materials intended for use <br /> on nonmetallic piping penetrations shall be investigated for compatibility with the <br /> nonmetallic pipe materials. <br /> 7. Hanger/Bracing/Supports- Piping hangers, sway bracing, and supports shall be ❑ ❑ ❑ <br /> installed as per plans and NFPA. <br /> Fire Marshal's Office 425.257.8100 1 everettwa.gov/fire INFORMATION HANDOUT C-6 4.13.2020 I Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.