Laserfiche WebLink
STEP 3. DETERMINE FLOW CONTROL REQUIREMENT <br /> Does this project create greater than 200 square feet of net new impervious area (item F from <br /> table above)? <br /> x Yes No <br /> If yes, then the project is not exempt and flow control is required. Complete entire <br /> checklist. <br /> If no, then the project is exempt from the flow control requirement. Skip the rest of <br /> Step 3 and complete STEP 4 of this report. <br /> Determination of "fee in-lieu of flow control' eligibility: <br /> Is the project in the eligible sub-basin of the combined sewer area as depicted in Figure 6-10.1 <br /> of the Figure 6-10. 1 of the City of Everett Design and Construction Standards and <br /> Specifications (pg 6-1511. <br /> x Yes X No I This property is not within the Fee In-Lieu area.TN 5/11/23 <br /> If no, then the fee option is not available for your project. Skip the fee calculation <br /> below and complete the rest of the checklist. <br /> If yes, will this project choose to take the fee option instead of designing and installing a <br /> flow control facility? <br /> x Yes X NO I Not Applicable.TN 5/11/23 <br /> If yes, then calculate fee using the table below and complete Steps 4 of this checklist <br /> (Step 5 not required). <br /> If no, skip the fee calculation below and complete the rest of the checklist. <br /> Table for calculation of fee in=lieu-of flow control <br /> 1. Enter total net new impervious (Item 1152 <br /> F from table above <br /> 2. Subtract 200 sf 952 <br /> 3. Fee per sf $3.72/SF <br /> Calculate Total Fee by multiplying item #2 by 3541 .44 <br /> item #3 <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 8 <br /> the Combined Sewer Area-September 2022 <br />