My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3421 TULALIP AVE 2025-11-03
>
Address Records
>
TULALIP AVE
>
3421
>
3421 TULALIP AVE 2025-11-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 3:28:52 PM
Creation date
10/27/2025 10:33:34 AM
Metadata
Fields
Template:
Address Document
Street Name
TULALIP AVE
Street Number
3421
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> PERMIT EXTENSION EXTENSION <br /> 3/10/2023 3/10/2023 (REASON Unassigned APPROVED <br /> REQUIRED) <br /> Notes: <br /> From:David Morris<davidmorris424@msn.com> <br /> Sent: Friday,March 10,2023 2:44 PM <br /> To:Sheyenne Morton<SMorton@everettwa.gov> <br /> Subject:Re: [EXTERNAL] Re: BW2010-002 3421 TULALIP AVE; Requesting Further Project Extension <br /> Hello Ms.Morton, <br /> Our project has been moving forward,slowly but surely.There is now an end in sight. Having just realized that our prior extension will be ending soon,I <br /> am writing to request another extension. It is not with excessive optimism that I would conclude that another 6 month extension should more than <br /> suffice.Please confirm receipt of this email,as I would not want to be negligent in renewing this on time. <br /> Thank you once again for your assistance, <br /> David Morris <br /> 4/6/2023 4/6/2023 BLDG 12- RAKEEB KHAN CORRECTION eTRAKiT Inspection Request <br /> INSULATION REQUIRED <br /> Notes: <br /> 3/30/2023 4:09 PM David Morris <br /> Contact Name:David Carlton Morris <br /> Site Address:3421 Tulalip <br /> Phone:3604202055 <br /> e-Mail:davidmorris424@msn.com <br /> Remove insulation for framing inspection.Need electrical rough in approval prior to framing inspection. <br /> 4/14/2023 4/14/2023 BLDG 08-FRAMING RAKEEB KHAN APPROVAL eTRAKiT Inspection Request <br /> Notes: <br /> 4/6/2023 2:56 PM David Morris <br /> Contact Name:David Carlton Morris <br /> Site Address:3421 Tulalip <br /> Phone:3604202055 <br /> e-Mail:davidmorris424@msn.com <br /> 4/14/2023 4/14/2023 BLDG 12- RAKEEB KHAN APPROVAL <br /> INSULATION <br /> Notes: <br /> Place removed insulation back in place. <br /> I <br /> Printed:Wednesday, 27 September, 2023 3 of 4 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.