My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 10/27/2025 Change Order 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 10/27/2025 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:23 AM
Creation date
10/29/2025 10:40:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
10/27/2025
Council Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacement
Public Works WO Number
UP3813
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0004489
Total Compensation
$18,737.28
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 8/28/2024
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />PROJECT: City of Everett <br />WFP Air Scour Blower Building Replacement WO UP3813 <br />WORK CHANGE DIRECTIVE – No. 008 <br />DATE OF ISSUANCE: September 11, 2025 <br />You are directed to proceed promptly with the following change (s): <br />Description: Delete per plan power cables between VFDs and Blower Motors. Replace with <br />VFD cables. <br />Payment shall be tracked on a time and material basis. $3,000.00 will be paid through Bid Item <br />3, TESC. $1,382.83 will be paid through Bid Item 16, Minor Changes. $170.65 will be paid <br />through Change Order 01. <br />Purpose of WCD-008: VFD cables protect motors from high frequence voltage spikes and <br />electromagnetic interference. The per plan power cables did not. <br />Attachments: (List documents supporting change): IMCO force account documentation. <br />If a claim is made that the above change(s) have affected Contract Price or Contract Times, any <br />claim for a Change Order based thereon will involve one or more of the following methods of <br />determining the effect of the change(s). <br />Method of determining change Method of determining change <br />In Contract Price: in Contract Times: <br /> Lump Sum Contractor’s records <br /> Time and Material Engineer’s records <br /> Other - Other <br />Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract <br />Times: <br />$4,553.48 Substantial Completion 0 days: <br />If the change involves an increase, the Ready for final payment 0 days: <br />estimated amount is not to be exceeded If the change involves an increase, the <br />estimated without further authorization. times are not to be exceeded without further <br />authorization. <br />ACCEPTED: IMCO General Construction AUTHORIZED: City of Everett <br />By: Date: By: Date: (Authorized Signature) (Authorized Signature) <br />Page 1 of 1 <br />9/11/2025
The URL can be used to link to this page
Your browser does not support the video tag.