Laserfiche WebLink
Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />PROJECT: City of Everett <br />WFP Air Scour Blower Building Replacement WO UP3813 <br />WORK CHANGE DIRECTIVE – No. 008 <br />DATE OF ISSUANCE: September 11, 2025 <br />You are directed to proceed promptly with the following change (s): <br />Description: Delete per plan power cables between VFDs and Blower Motors. Replace with <br />VFD cables. <br />Payment shall be tracked on a time and material basis. $3,000.00 will be paid through Bid Item <br />3, TESC. $1,382.83 will be paid through Bid Item 16, Minor Changes. $170.65 will be paid <br />through Change Order 01. <br />Purpose of WCD-008: VFD cables protect motors from high frequence voltage spikes and <br />electromagnetic interference. The per plan power cables did not. <br />Attachments: (List documents supporting change): IMCO force account documentation. <br />If a claim is made that the above change(s) have affected Contract Price or Contract Times, any <br />claim for a Change Order based thereon will involve one or more of the following methods of <br />determining the effect of the change(s). <br />Method of determining change Method of determining change <br />In Contract Price: in Contract Times: <br /> Lump Sum Contractor’s records <br /> Time and Material Engineer’s records <br /> Other - Other <br />Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract <br />Times: <br />$4,553.48 Substantial Completion 0 days: <br />If the change involves an increase, the Ready for final payment 0 days: <br />estimated amount is not to be exceeded If the change involves an increase, the <br />estimated without further authorization. times are not to be exceeded without further <br />authorization. <br />ACCEPTED: IMCO General Construction AUTHORIZED: City of Everett <br />By: Date: By: Date: (Authorized Signature) (Authorized Signature) <br />Page 1 of 1 <br />9/11/2025