My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 10/27/2025 Change Order 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 10/27/2025 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:41:23 AM
Creation date
10/29/2025 10:40:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
10/27/2025
Council Approval Date
8/28/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Air Scour Blower Building Replacement
Public Works WO Number
UP3813
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0004489
Total Compensation
$18,737.28
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 8/28/2024
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 63 63 - 4 <br />WFP Air Scour Building Replacement WO# 3813 <br />00 63 63 - 4 CHANGE ORDER – AGREED (Addendum 1) <br />Change Order No.____1____________________ <br />Change Order Effective Date:__9/xx/25_________ <br />Exhibit A—Description of Changed Work <br />Change Order #1 adds one (1) new item to the contract and modifies one (1) bid item as follows: <br />New Item <br />New Item #18 – Air Scour Revisions. Create new item #18 entitled Air Scour Revisions by adding <br />a lump sum line item in the amount of $17,216.08. New item #18 Air Scour Revisions provides <br />payment for WCD-007 Existing Blower Repairs in the amount of $17,045.43 and WCD-008 VFD <br />Cables in the amount of $170.65. Item #18 results in a $17,216.08 contract price increase. <br />Modified Item <br />Bid Item #12 – Crushed Surfacing Top and Base Course. Modify Bid Item #12 Crushed Surfacing <br />Top and Base Course by adding 0.41 tons of crushed surfacing top and base course to Bid Item <br />#12. This results in a $53.30 contract price increase. <br />Justification <br />Item #18 – Lump Sum. <br />WCD-007 – Existing blower is 32-years old. During startup of the blower, there were abnormal <br />bearing noises. No records can be found that document that the bearings have been replaced. <br />New bearing housings are needed to install the city provided vibration and RTD sensors. <br />Replacement of the bearings and bearing housings was recommended by the commissioning <br />technician. <br />WCD-008 – The contact plans and specifications did not require VFD cables. VFD cables <br />protect motors from high frequence voltage spikes and electromagnetic interference caused by <br />the VFDs that control the motors. VFD cables will extend the life of blower motors. <br />Bid Item #12 – Quantities provided in the bid tabulations are the engineer’s estimated quantities. <br />It is common for the actual quantity used to be different than the estimated quantity.
The URL can be used to link to this page
Your browser does not support the video tag.