My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell, Inc. 10/28/2025
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Brown and Caldwell, Inc. 10/28/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:51:32 AM
Creation date
10/29/2025 10:49:48 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell, Inc.
Approval Date
10/28/2025
Council Approval Date
10/22/2025
End Date
12/31/2028
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WPCF Headworks Replacement - Design
Tracking Number
0004998
Total Compensation
$8,998,917.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
WPCF Headworks Replacement Project Scope of Work <br />63 <br /> <br />Discipline Sheet <br />Number <br />Sheet <br />Count Drawing Title <br />E 0011 236 HEADWORKS SCREENS PLAN - 3 - POWER/SIGNAL/CONTROLS <br />E 0012 237 HEADWORKS SCREENS PLAN - 4 - POWER/SIGNAL/CONTROLS <br />E 0013 238 BYPASS CHANNEL PLAN - POWER/SIGNAL/CONTROLS <br />E 0014 239 <br />TRUCK LOAD OUT UPPER LEVEL PLAN - <br />POWER/SIGNAL/CONTROLS <br />E 0015 240 <br />TRUCK LOAD OUT LOWER LEVEL PLAN - <br />POWER/SIGNAL/CONTROLS <br />E 0016 241 <br />HEADWORKS GRIT REMOVAL LOWER LEVEL PLAN - <br />POWER/SIGNAL/CONTROLS <br />E 0017 242 <br />HEADWORKS GRIT REMOVAL UPPER LEVEL PLAN - <br />POWER/SIGNAL/CONTROLS <br />E 0018 243 <br />HEADWORKS ODOR CONTROL PLAN - <br />POWER/SIGNAL/CONTROLS <br />E 0019 244 <br />INFLUENT CHANNEL PLUS GATES LL PLAN - <br />LIGHTING/RECEPTACLES <br />E 0020 245 <br />INFLUENT CHANNEL PLUS GATES UPPER LEVEL PLAN - <br />LIGHTING/RECEPTACLES <br />E 0021 246 <br />INFLUENT PUMPING STATION LOWER LEVEL PLAN - <br />LIGHTING/RECEPTACLES <br />E 0022 247 <br />INFLUENT PUMPING STATION UPPER LEVEL PLAN - <br />LIGHTING/RECEPTACLES <br />E 0023 248 HEADWORKS SCREENS PLAN - 1 - LIGHTING/RECEPTACLES <br />E 0024 249 HEADWORKS SCREENS PLAN - 2 - LIGHTING/RECEPTACLES <br />E 0025 250 HEADWORKS SCREENS PLAN - 3 - LIGHTING/RECEPTACLES <br />E 0026 251 HEADWORKS SCREENS PLAN - 4 - LIGHTING/RECEPTACLES <br />E 0027 252 BYPASS CHANNEL PLAN - LIGHTING/RECEPTACLES <br />E 0028 253 <br />TRUCK LOAD OUT UPPER LEVEL PLAN - <br />LIGHTING/RECEPTACLES <br />E 0029 254 <br />TRUCK LOAD OUT LOWER LEVEL PLAN - <br />LIGHTING/RECEPTACLES <br />E 0030 255 <br />HEADWORKS GRIT REMOVAL LOWER LEVEL PLAN - <br />LIGHTING/RECEPTACLES <br />E 0031 256 <br />HEADWORKS GRIT REMOVAL UPPER LEVEL PLAN - <br />LIGHTING/RECEPTACLES <br />E 0032 257 HEADWORKS ODOR CONTROL PLAN - LIGHTING/RECEPTACLES <br />E 0033 258 HEADWORKS BUILDING ROOF PLAN - POWER <br />E 0034 259 <br />HEADWORKS BUILDING ROOF PLAN - LIGHTNING PROTECTION <br />(PERFORMANCE) <br />E 0035 260 <br />HEADWORKS ELECTRICAL ROOM - ENLARGED PLAN - <br />EQUIPMENT LAYOUT <br />E 0036 261 HEADWORKS GENERATOR PLAN <br />E 0037 262 ELECTRICAL SECTIONS - 1 <br />E 0038 263 ELECTRICAL SECTIONS - 2 <br />E 0039 264 ELECTRICAL SECTIONS - 3 <br />E 0040 265 ELECTRICAL SECTIONS - 4
The URL can be used to link to this page
Your browser does not support the video tag.