Laserfiche WebLink
-FRAME OVER 2x6 POST PER PLAN- <br /> (E) 18x18x10" LANDING JOISTS w/ INSTALL PLUMB <br /> THK FT'G 2x6 PT THK DECKING 6-INCHES ABOVE <br /> I (E) &6 POST w/ <br /> I [VERIFY] SPANNING OVER MIN. jCB66 BASE BOTTOM OF HOLE <br /> 1 <br /> I (3) JOISTS. MAINTAIN Sx8 HF2 PT NOTCH PRIOR TO CONCRETE NOTCHED PT <br /> 1 <br /> EMMBB HF2 PT ED. POST 9'-1Ya" 1�" MAX. GAP BETWEEN FTG BELOW(TYP. ®TOP&EMBED. INTO LACEMENT STRINGER PER PLAN <br /> (TYP. 0(4) 4,-8" 1 I DECKING PLANKS. <br /> LOCATIONS) 1 1 10/S3.0 (2) LOCATIONS) FLASH w/DRIP LINE ® oo <br /> 24 24 24 L ri (E) 12.6-THICKENED (TYP.) POST TO DISCOURAGE SECURE TOE PLATE NQ G 0 <br /> I SLAB EDGE w/(2) GUARD POST[SEE Z WATER INTRUSION NOTCHED PT ML EA. STRINGER w" o= <br /> I #4 BARS SCHEDULE](TYP.) 5ZI BEVEL CONC. STRINGER PER PLAN SDS4SCRE(WS) }x1�" <br /> I FILLED HOLE 2x6 PT TOE <br /> 1\ I\`v\J I\ i SECURE N FTG TO 1 1 4x12 PT 4x14'PT S PLATE w/ wl — <br /> __ [Kill, <br /> I (E)FT'G w/(2) #4 �.� j 6 I THD37500H 0 PLATET TOE <br /> DOWELS, 30"LG. & LUS26 0 EA. JOIST - 26 PT 016'o/c UP N ETE EA. STRINGER C0 <br /> ` 24"0 x 42"DEEP CONC. I I SET-XP EPDXY[4" . \ / 1 P R ILLED HOLE — <br /> FILLED HOLE w/EMBED. 24 I EMBED.]SPECIAL 2x DIAGONAL PT BLOCKING ` _ S �. PLAN PER PLAN " O <br /> POST(TYP. ®24) 1% I INSPECTION REQUIRED. BETWEEN EA. JOIST& i \ ;/ CI I 1 0 - 2 TCP,LR 18") CUR 18 ) (� <br /> `�\ �(TYP. ®COLD JOINT) CS16 CONT. STRAP; RUN ; ; 6" (1)#4 BAR MIN. MIN. NOTCHED PT N <br /> 1 I- FROM POST TO POST - \ j 4x14 PT S ® 6„ EACH WAY STRINGER PER PLAN (� In <br /> O1 8x8 HF2 PT EMBED. POST I W"ry �. OSTTHROUGH CUR FTG PER 3" CUR Lo <br /> (TYP. ®(2) LOCATIONS) .,. 1 / \ Ito....,..,..,..,.�."�.W...,.�.,...,."",".,", PER PLAN FT'G PER PLAN N <br /> I� I 10x10 HF2 PT sa \ a�. 4x14 T INGE _ PLAN <br /> NOTCH TOP & I•N Y W—` I � 3 SECTION VIEW ELEVATION VIEW NOTCHED STRINGER >p a <br /> EMBED. INTO FT'G / \ m1 P( I 9 3x12 PT FLAT < Q N U? <br /> �� BELOW(TYP. ®(4) I3v; `\ ;; 2-LSCZ® A. TREAD w/TA10Z POST EMBEDMENT STRINGER TO -FT'G CONN. <br /> 24 / 24 I el I 6 •0 LOCATIONS) •DECKING \ i- STRINGER (TYP.) CLIPS EA. END 5 v tic U�0� � <br /> \ (TYp.) <br /> a 4w12 PT x14 T IN I TREAD PER PLAN <br /> •'+~ - tl w/ TAZ CLIPS DECKING PERQ �q +�'N N <br /> I� L N p <br /> 18x18" THK FTG w/ 6 736 STRINGER NOTCHED & A" O j W 3 <br /> 5/53.0(T1P.) 1 I #4 BARS®6" o/c BEARING ON BEA � "�w m 3 <br /> L F E.W. TOP&BOTTOM S_ � <br /> GUARD POST SCHEDULE 8/53.0(TYP.) (E)6x6 POST w/ SYz" ] ----- <br /> ESCENARIO I GUARD POST SIZE CB66 BASE = N <br /> (E) 18x18x10" (2)GUARD POSTS 0 A 4x8 c " BEAM PER V <br /> SINGLE 10x10 POST PLAN- <br /> - THK-FTG POST CENTERED ON BEAM 4x6 GA10KT CLIP POST PER 2-LSCZ CLIPS Z <br /> [VERIFY] POST ON STRINGER 4x6 i•- _ <br /> BEAM PER PLAN PLAN [FRONT CLIP O <br /> WEST STAIRS — FOUNDATION PLAN WEST STAIRS — FRAMING LANDING PLAN STRINGER TO DECK CONN. STRINGER TO DECKCONN. � <br /> " SCALE: �" = V-O" 7 8 — <br /> z <br /> O <br /> In <br /> € j"0 A307 THROUGH BOLT,NUTS & ti <br /> NEW(N) EXISTING(E) I WASHERSM MALLEABLE IRON 4x6 <br /> NEW(N) EXISTING(E) STRINGER PER PLAN <br /> �a"( •)I 4x6 GUARD POST GUARD rfl <br /> �� ; - N NOTCHFlTOST TO BEAMS 4" PERIMETER BM. POST <br /> [ 2"(TYP. <br /> w <br /> 4" MAX. FN <br /> Q¢z¢ I 3' _ F <br /> 10/S3.0 N�$ E"0 A307 THROUGH BOLT, 6" " - <br /> co }"0 A307 THROUGH <br /> 2x2 PICKETS(TYP.) (E) GUARD (T�'•) ; ^tip NUTS & MALLEABLE IRON BOLT, NUTS & WASHERS <br /> VERIFY � 4-8 5'-6" w NOTCH TO FIT O <br /> ))) z WASHERS " �I <br /> [VERIFY] z z LL 4x6 GUARD POST 4" WASHER & THROUGH '"� z _ <br /> 4 AX. A. r5zl �\ ,,,,,,,M,,,,,,,,,,,,", " F <;o o POST PER PLAN; ANGLE A A NUT ASSEMBLY [AS POST PED <br /> ER <br /> (T O I i 4x12 PTA" •4�4 P7 S 'l ER" NOTCH FOR FULL 6x12 PT BM. REQUIRED] PLAN <br /> E EGRESS ` ../ •.� I•r" - BEARING OF STRINGER . <br /> t�G <br /> _ I PER PLAN; 5X" <br /> WALKWAY ---- - �� : 3x12 P�Fl-AT TREAb ' 9 S3.0(T1P.) NOTCH 0 PSOT <br /> of w/TA10Z CLIPS EA ; PLAN VIEW SECTION A-A <br /> �END(TYP.) 9 POST TO STRINGER CONN. 10 POST TO PERIMETER BEAM CONN. LL1 — <br /> 70 (N)GUARD Ifa ai 7M.O("F.) 3 <br /> 4.4 TIS a `) Lu O <br /> DOUBLE JOIST =..."..'...'.,."'."... �.'� g F Lu Lu F— <br /> DECK LANDING o �f'� O1 ; ALIGNED w ,,,,,",,, „,,,„ "• u i ai w z �! <br /> o m GUARD DTT2Z ,+4x 4,PT$ I GER „�, •v € ,^ D! LL..I �l m <br /> I-3Y2" - I 5Y2" V Q. V, <br /> 2x6 PT 0 16"o% P n I x o 0 2x4 RAIL SECURED TO GUARD �� U 0 <br /> �' ; a If POST w/LS30 CUPS <br /> TREAD PER Q Q = <br /> (TYP•) [- _ 4x12 PT pT o `O PLAN w/ 4x6 PT GUARD POST <br /> o TAZ CUPS ]_'_ ~ <br /> GRADE - - �� A EA PER PLAN T04GUARDOPOST w/ELS30D �' m <br /> ...""".... _.. i D LLJ <br /> pz <br /> "• `� w/ TAZ CLIPS LO <br /> 4x6 PT GUARD 2-LSCZ 0 EA. UPS (TYP.) ,� w <br /> POST TYp. STRINGER (TYP.):. <br /> ( ) STRINGER <br /> SDWS19600 (TYP.) PER PLAN ' ) Lu <br /> 6%" �2. �i <br /> PY1?/c/JE IUA�IO nQCcS AlEd GJ SL�� 5' 4x10 PT BLOCKING; SECURE <br /> OF Srez c5 �h/Wz 4 J�LOc sEC �olv, 4x10 PT DTT2Z TIE CENTERED ON ®ENDS w/ (2) 16d TOENAILS I DTT2Z TIE CENTERED ON GUARD U� <br /> " BLOCKING; GUARD POST w/J"0 A307 POST & TREAD w/ }0 A307 <br /> SECURE ®ENDS THROUGH BOLT w/ NUTS PICKETS NOT SHOWN THROUGH BOLT w/ NUTS & <br /> WEST STAIRS ELEVATION W — PP FRAMING PLAN w/ (2) 16d & MALLEABLE IRON MALLEABLE IRON WASHERS — <br /> 3 SCALE: = V-O" 4 SCALE: = 1'-0- TOENAILS WASHERS (TYP.) <br /> ' SECTION A-A COVjN�.. <br /> ' f A <br /> GUARD POST & STRINGER CONN. "` a'O <br /> U Z <br /> (-41& ,/or IP4sS v SPu�kr, " 343 <br /> � 3 � <br /> r �NAL <br /> N � <br /> O <br /> a <br /> o MAR 01,2022 <br /> M <br /> i <br /> io Drawn By:JIB <br /> DOUBLE JOIST Checked By:CCC <br /> Date:02-28-2022 <br /> r.7 5DA JOB NO. <br /> SDWS19600 (TYP. J DTT2Z TIE CENTERED ON ��^2 5^ <br /> iv GUARD POST w/ "0 A307 .. `tJ /"V <br /> THROUGH BOLT w/NUTS <br /> BEAM PER PLAN & MALLEABLE IRON STRUCTURAL <br /> WASHERS (TYP.) <br /> 12 INTERMEDIATE GUARD POST CONN. CITY OFEVERETT NOTES/ <br /> REVIEWED FOR PERMIT DETAILS <br /> � -3 .0 <br />